Combination of technical and economic application of the contract management(结合技术和经济合同管理的应用).doc
- 1、本文档共11页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Combination of technical and economic application of the contract management(结合技术和经济合同管理的应用)
Combination of technical and economic application of the contract management
Abstract: Yixing pumped storage power stations, reservoir construction, the use of a combination of technical and economic methods, the success of changes to the contract claims process and results.
Keywords: technical and economic, integration, and contract management doi: 10.3969/j.issn.1006-8554.2010.09.089 in the construction market, contractors, contract changes and claims is a major source of profit, and contract management, the full application of technical and economic approach is to combine contract changes and claims of success and effective way to one of the measures in this, the author of a combination of technical and economic Yixing Pumped Storage Power Station in the reservoir on the application of the management contract for a description.
1 Project Overview Yixing Pumped Storage Power Station is located in the southwest suburb of Yixing City, Jiangsu Province, about 10km of Tongguanshan mountain, is a daily regulation of pure pumped storage power station. 4 power plant installed capacity, with a total installed capacity of 1 000MW, the power grid in the main responsible for peak shaving, valley filling and spinning reserve, frequency modulation, the same transfer function.
The power plant from the upper reservoir, lower reservoir, water system, underground plant and ground switching station, the control building and other building components. Tongguanshan peak on the reservoir is located near the source of Au in the ditch by the main dam, secondary dam and library Zhoushan Ling surrounded. the main dam is a reinforced concrete panels mixed rock-fill dam, secondary dam of RCC gravity dam, the basic library basin formed by the excavation of the reservoir surface protection impervious reinforced concrete, with a total storage capacity of 5,307,000 m3. under Reservoir is located in the foothills north of Shandong Tongguan, using the original height
您可能关注的文档
- Combat- how to use psychology to make double sales-(战斗u2014u2014如何利用心理学双销售).doc
- Combat- How to Use Search Mining Customer Value(战斗u2014u2014如何使用有哪些信誉好的足球投注网站挖掘客户价值).doc
- Combat- how to use social media startups achieve marketing maximize the effect of(战斗u2014u2014如何使用社交媒体初创企业实现营销效果的最大化).doc
- Combat- how to use social media startups do marketing(战斗u2014u2014如何使用社交媒体初创公司做营销).doc
- Combat- how to use SocialCRM achieve universal micro-channel marketing-(战斗-如何使用SocialCRM实现普遍微通道营销).doc
- Combat- how to use the Baidu Post Bar cited traffic-(战斗u2014u2014如何使用百度贴吧u2014u2014引用流量).doc
- Combat- how to use the Internet for online work thinking-(战斗u2014u2014如何使用互联网在线思考u2014u2014工作).doc
- Combat- how to use the Internet channel thinking of winning turnaround(战斗u2014u2014如何利用互联网渠道获胜的思维转变).doc
- Combat- How to use the Internet to create an Internet team thinking(战斗u2014u2014如何利用互联网来创建一个网络团队思维).doc
- Combat- How to use the Internet to sell 99 yuan + thinking milk-(战斗u2014u2014如何利用互联网销售99元+牛奶u2014u2014思考).doc
文档评论(0)