Combination of technical and economic application of the contract management(结合技术和经济合同管理的应用).doc

Combination of technical and economic application of the contract management(结合技术和经济合同管理的应用).doc

  1. 1、本文档共11页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Combination of technical and economic application of the contract management(结合技术和经济合同管理的应用)

Combination of technical and economic application of the contract management Abstract: Yixing pumped storage power stations, reservoir construction, the use of a combination of technical and economic methods, the success of changes to the contract claims process and results. Keywords: technical and economic, integration, and contract management doi: 10.3969/j.issn.1006-8554.2010.09.089 in the construction market, contractors, contract changes and claims is a major source of profit, and contract management, the full application of technical and economic approach is to combine contract changes and claims of success and effective way to one of the measures in this, the author of a combination of technical and economic Yixing Pumped Storage Power Station in the reservoir on the application of the management contract for a description. 1 Project Overview Yixing Pumped Storage Power Station is located in the southwest suburb of Yixing City, Jiangsu Province, about 10km of Tongguanshan mountain, is a daily regulation of pure pumped storage power station. 4 power plant installed capacity, with a total installed capacity of 1 000MW, the power grid in the main responsible for peak shaving, valley filling and spinning reserve, frequency modulation, the same transfer function. The power plant from the upper reservoir, lower reservoir, water system, underground plant and ground switching station, the control building and other building components. Tongguanshan peak on the reservoir is located near the source of Au in the ditch by the main dam, secondary dam and library Zhoushan Ling surrounded. the main dam is a reinforced concrete panels mixed rock-fill dam, secondary dam of RCC gravity dam, the basic library basin formed by the excavation of the reservoir surface protection impervious reinforced concrete, with a total storage capacity of 5,307,000 m3. under Reservoir is located in the foothills north of Shandong Tongguan, using the original height

您可能关注的文档

文档评论(0)

jiupshaieuk12 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6212135231000003

1亿VIP精品文档

相关文档