Formal Methods in SafetyCritical Railway Systems(正式的方法在SafetyCritical铁路系统).pdfVIP

Formal Methods in SafetyCritical Railway Systems(正式的方法在SafetyCritical铁路系统).pdf

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Formal Methods in SafetyCritical Railway Systems(正式的方法在SafetyCritical铁路系统)

Formal Methods in Safety-Critical Railway Systems 1 1 1 Thierry Lecomte , Thierry Servat , Guilhem Pouzancre 1 ClearSy, Aix en Provence, France. {thierry.lecomte, Thierry.servat, guilhem.pouzancre}@ Abstract. In this article we would like to present some recent applications of the B formal method to the development of safety critical systems, namely platform screen door controllers. These SIL3/SIL4 compliant systems have their functional specification based on a formal model. This model has been proved, guaranteeing a correct by construction behaviour of the system in absence of failure of its components. The constructive process used during system specification and design leads to a high quality system which has been 2 qualified by French authorities. 1. Introduction Historically, the B Method was introduced in the late 80s to design correctly safe software (see 3 [Abrial 96]). Promoted and supported by RATP , B and Atelier B, the tool implementing it, have been successfully applied to the industry of transportation. First real success was Meteor line 14 driverless metro in Paris: Over 110 000 lines of B models were written, generating 86 000 lines of Ada. No bugs were detected after the proofs, neither at the functional validation, at the integration validation, at on-site test, nor since the metro lines operate (October 1998). The safety-critical software is still in version 1.0 in year 2007, without any bug detected so far. Today, Alstom Transportation Systems and Siemens Trans

您可能关注的文档

文档评论(0)

hhuiws1482 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:5024214302000003

1亿VIP精品文档

相关文档