- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
土建造价员应该掌握的预算小知识(The budget knowledge that construction cost personnel should master)
土建造价员应该掌握的预算小知识(The budget knowledge that construction cost personnel should master) Earthwork volume conversion table glossary: Loose fill volume: Backfill After tamping volume: the compacted soil Natural volume: dense untouched soil Virtual Party: volume of loose soil dug under natural conditions The difference between excavation and earthwork excavation foundation list list: Earthexcavation: for a separate section of earth. Digging earthwork Foundation: for in addition to a separate section outside the earth. The general is on top of compacted area or foundation cushion area according to the calculated? According to the general calculation of tamp foundation cushion area. The base brazing is calculated according to the sloping bottom or top? The pit bottom calculation. How much is the non working surface of concrete cushion width? Non concrete cushion does not need to keep working face excavation large area fill cushion size. The cushion surface slope, foundation work is based on the surface or cushion? According to the 0.1 cushion. The difference of dynamic compaction and compaction of the soil: Compaction: backfill soil compaction. As the foundation excavation, backfill foundation after finish, need to backfill soil compaction. The original soil compaction: unexcavation without backfill site, in order to ensure the bearing capacity of the original ground tamp. Such as the selection of basic indoor ground, need to consolidate after decoration. The difference between homework assignments and the pit pit: Pit operation: machinery has been operating in the pit, and a machine under the ramp. Pit operation: outdoor terrace to the foundation, has been in the outdoor floor work machinery. The artificial substrate and the meaning of slope trimming: The rock blasting of bottom and slope after artificial cleaning and dressing. The difference between the mud and sand flow: Sludge deposition and soil organic matter in water and slow water environment. The flow of sand: eart
您可能关注的文档
- 魔术师的基本技能.doc
- 魔术师的大象.ppt
- 魔术晚间规划书.doc
- 魔术店经营策略.pdf
- 魔术气球狮子插图.doc
- 魔术学会章程.doc
- 魔术知识和经验.doc
- 魔术课第一课计划.doc
- 魔术的五大优势 - 魔术巨人.pdf
- 魔术泡泡表演.ppt
- 土建施工经验总结(Summary of civil construction experience).doc
- 土方与桩工机械(Earth and pile machinery).doc
- 土方回填方案样本(Earthwork backfill sample).doc
- 土方歳三 丰玉发句集(She set jade say Mitutoyo earth).doc
- 土建工程造价管理的科学控制(Scientific control of civil engineering cost management).doc
- 土木地质试题(Civil and geological examination questions).doc
- 土木工程 学生误区(Misunderstanding of civil engineering students).doc
- 土方系数计算(Earthwork coefficient calculation).doc
- 土木工程专业英语1(Civil Engineering English 1).doc
- 土木工程专业英语翻译第二十一课(English for civil engineering twenty-first lessons).doc
最近下载
- 第8课 隋唐政治演变与民族交融-【中职专用】《中国历史》魅力课堂教学课件(高教版2023•基础模块).pptx VIP
- 人力资源管理开题(课题背景研究目的与意义【必威体育精装版】.docx VIP
- 《生产调度与控制实务》课件.ppt VIP
- 2025水电工程信息分类与编码第4部分:水工建筑物.docx
- PMP项目管理培训课件项目.pptx VIP
- xx公司集团中铁工程部内部管理制度.doc VIP
- 2025年汽车驾驶员技师资格证书考试及考试题库含答案.docx
- 盐酸普鲁卡因工艺说明书8.pdf VIP
- 外研版小学三年级的英语第一单元试题.doc VIP
- 经济学原理(第8版)微观经济学曼昆课后习题答案解析.pdf
文档评论(0)