- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
土建施工经验总结(Summary of civil construction experience)
土建施工经验总结(Summary of civil construction experience) The basic check slot or pile. Trough inspection (shallow foundation), will be accompanied by the staff survey together, and whether the field investigation report, if there is abnormal place, nature of the main observation bearing layer, such as we are in the area of shallow foundation No. 2 Hicks. The soil is hard, color Brown, also with some differentiation substances. In addition this 2 soil is thin, generally is 1~2 meters, so the site can be used 12 rib steel insert bearing layer, see after the removal of the soil and the depth in the steel stick to determine the thickness of the pile. (Zhuang Ji), which is mainly based on the bearing capacity of pile the calculation of pile machine tonnage, according to check soil geological report any abnormal (mainly through the pile pile up to judge), observe the last 1 meters used in degree, the pile up phenomenon is obvious, the current pile machine check. Especially a large cast-in-place pile head should be strictly controlled For the filling coefficient of cement mixing pile. Focuses on the control of the water cement ratio, cement content per meter. And the mixing times. Reinforcement foundation acceptance: As the focus of the course is to check the bar, including the reinforcement information is not comprehensive, the factory test report report entry Report According to the site \ \ distance location drawings check steel wire is not conform to the standard \ base size, the thickness of the protective layer welding, appearance quality inspection Ask the welded joint pull test report. Lap length, anchorage length. Nodes (primary and secondary beam junction, Liang Zhu junction) at most can manifest the reinforcement engineering quality The amount of the. The additional reinforced beam, such as beam hanger and floor hanger setting mode is the opposite. The steel bar at the lower end of the horizontal section length is fixed position. The stirrup settings are correct. The
您可能关注的文档
- 魔术师的基本技能.doc
- 魔术师的大象.ppt
- 魔术晚间规划书.doc
- 魔术店经营策略.pdf
- 魔术气球狮子插图.doc
- 魔术学会章程.doc
- 魔术知识和经验.doc
- 魔术课第一课计划.doc
- 魔术的五大优势 - 魔术巨人.pdf
- 魔术泡泡表演.ppt
- 土方与桩工机械(Earth and pile machinery).doc
- 土方回填方案样本(Earthwork backfill sample).doc
- 土方歳三 丰玉发句集(She set jade say Mitutoyo earth).doc
- 土建工程造价管理的科学控制(Scientific control of civil engineering cost management).doc
- 土木地质试题(Civil and geological examination questions).doc
- 土木工程 学生误区(Misunderstanding of civil engineering students).doc
- 土方系数计算(Earthwork coefficient calculation).doc
- 土木工程专业英语1(Civil Engineering English 1).doc
- 土木工程专业英语翻译第二十一课(English for civil engineering twenty-first lessons).doc
- 土木工程学生的常见认识误区分析与解答(Analysis and solution of common misunderstandings in civil engineering students).doc
文档评论(0)