- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
土方系数计算(Earthwork coefficient calculation)
土方系数计算(Earthwork coefficient calculation) Earth conversion (2008-01-10 20:23:47) reprint labels: Gossip Summed up the general excavation is natural; compacting, embankment compaction, borrowers are generally ordinary soil, natural dense square. If the loan words should be multiplied by the coefficient of soil 0.87. to take the 0.80 to 0.92 by the hard soil. For example: One of the distinctive features of the new quota is in the subgrade soil rock engineering, considering the conversion coefficient between the natural and the compaction density, due to the use of this factor, in the calculation and allocation of the number of subgrade soil, rock excavation, we should consider this factor, which should not be simply according to section volume allocation. For Subgrade Earthwork engineering, excavation by natural dense volume calculation, calculation, fill volume after pressing so as to fill and compaction volume for engineering quantity, using natural compacting party as the calculating unit, the quota should be multiplied by the provisions of the conversion coefficient. The chapter explains the fixed coefficient, which transport column in the quota specified in the chapter, suitable for artificial excavation of Zengyun quota and motor dump trucks, tractors, earthmoving truck transport earthwork transportation quota. This coefficient include increasing the wastage cost for earth rock engineering project quota quota level are compiled in the section of the embankment construction, the efficiency level is low concentration of soil soil field. To borrow, the quota items in the calculation of the digging and loading, can put the number of parts, including the loss of earthwork completed by the artificial mechanical consumption, but for transportation, there is not much difference between the two situations, the same considerations on loss, increase the cost of manual and machinery. The quota chapter shows the coefficient using the rules illustrated as follows: On a line (
您可能关注的文档
- 魔术学会章程.doc
- 魔术知识和经验.doc
- 魔术课第一课计划.doc
- 魔术的五大优势 - 魔术巨人.pdf
- 魔术泡泡表演.ppt
- 魔术隐形线生产.doc
- 魔术PPT(10P).ppt
- 魔术泡泡表演 - 适合互动节目.ppt
- 魔术贴生产过程.doc
- 魔法社会精神魔法教学计划书.doc
- 土木工程专业英语1(Civil Engineering English 1).doc
- 土木工程专业英语翻译第二十一课(English for civil engineering twenty-first lessons).doc
- 土木工程学生的常见认识误区分析与解答(Analysis and solution of common misunderstandings in civil engineering students).doc
- 土木工程施工4(Civil engineering construction 4).doc
- 土木工程专业英语翻译(Civil Engineering English translation).doc
- 土木工程知识专业介绍(Introduction to civil engineering knowledge).doc
- 土地闲置(Idle land).doc
- 土木工程毕业如何找工作(Civil engineering graduate, how to find a job).doc
- 土木材料(Civil material).doc
- 土建基本要素(Basic elements of Civil Engineering).doc
文档评论(0)