- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
全站仪在公路导线和中线测量中的应用中英文.
Abstract: The total station in the highway center line conductors and the application of measurement techniques, the Total Station use matters needing attention.
Key words: Total Station Road measuring techniques
1 Total station in the wire measurement
1.1 Total Station Coordinate the advantages of Total Station can be used directly with the measuring point coordinate method, rather than polar coordinates law required, so that heavy equipment operators from the calculation of the data out. Outside the industry are now virtually no records, only a simple mind and the next point with the point of the relationship between the finishing industry for the reference period, but also do not have staff with a record of the calculation. Finishing in a time when the industry as long as the data transmission from the total station to PC2E500 calculator, or directly to the data input to a computer, after coordinate adjustment, on the computer using Auto CAD drawing software such as points, cut-off point, and calculated the angle value of each curve, the distance between the point of intersection as well as the coordinates of each pile and so.
1.2 Note and the application of state-controlled three-dimensional coordinates of points Coordinates method used before, as far as possible the country to find control points and control points of these three-dimensional coordinates, and these control points through the join test, not only can test their measurement accuracy, and error-yun Xu scope can be carried out through the adjustment of these coordinates, so that a higher measurement accuracy.
1.3 Point set should take into account the need to take the middle lane In the set point, not only should be wire line control points, that is, to point the center line should also prepare for the release, depending on the route pass conditions, 5 and higher terrain can be laid at a number of aircraft equipment, the benefits of doing so is to take the middle lane when there is a greater choice a
文档评论(0)