- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
炉子安装(Furnace installation)
炉子安装(Furnace installation) 1. further confirmation of installation position; 2., out of the box, remove the heating furnace, confirmed temperament is consistent, if inconsistent, should be replaced or recorded; 3. remove the brackets and drawings; 4. installing flue: 5. connect the five pipes in the lower part, and pay attention to the gasket; 6. connect the power supply and the indoor temperature controller. Open the front panel of the machine and connect the power supply according to the N, L and E. Connect the 1-3 contacts according to the temperature controller and put on the panel; 7.: open the tap water inlet and water leakage switch, open the switch to the water heating system, water injection, water injection until 3Bar, close the switch, see if there is a leak, and Caution! Pressure relief valve is opened at the same time; sanitary hot water, to see if there is a leak with soap and water; try whether gas pipeline gas leakage. Turn off the tap water switch, turn on the water injection switch, turn on the faucet, and release part of the water in the heating system until the water pressure drops to about 1Bar; 8. fill in the installation record. So far, the installation process is complete. This section describes the debugging process 1. to open the automatic injection system, exhaust valve exhaust valve and pump radiator on, until the pressure 1Bar, check all pipe connections if there is a leak; open the tap, check all pipe connections if there is a leak; 2. connect to the power outlet and turn on the gas switch; 3. open the front panel; 4. first ignition, Turn the mode selection to summer, turn on the faucet, observe the electronic ignition and ignition; Regulating water flow and regulating hot water temperature control, observing whether or not the flame has changed and changed: the water quantity is large, the flame is large; when the temperature is raised, the flame is big, and the flame is smaller when the temperature is lowered; The mode selection of sp
您可能关注的文档
- 施工放线(工地实用)(Construction release (site utility)).doc
- 施工的工艺流程(Construction process).doc
- 旅游知识问答(Travel quiz).doc
- 施工放线之内控法怎样操作施工放线之内控法怎样操作(How to operate the internal control method of construction line and how to operate the internal control method).doc
- 旅游网络公共关系营销探索(Exploration of public relations marketing in Tourism Network).doc
- 旅游规划应着力的八个要点(Eight points to be stressed in tourism planning).doc
- 施工残忆(Construction remnant).doc
- 无心磨床加工的磨削缺分析(Analysis of grinding loss in centerless grinding machine).doc
- 无损检测标准一览表(List of standards for nondestructive testing).doc
- 无比打字口诀(Very typing formulas).doc
最近下载
- 国开一体化平台00023《Photoshop图像处理》模拟试题(1-3)试题及答案.docx VIP
- 肉食品加工厂污水处理方案设计.doc VIP
- 社群营销:社群营销的全面实施PPT教学课件.pptx
- 大学生职业生涯规划.pdf VIP
- 食品调和油-标准全文.pdf VIP
- 危重患者镇痛和镇静管理PPT.pptx
- (高清版)DG∕TJ 08-2242-2023 民用建筑外窗应用技术标准.pdf VIP
- 劳动通论(中国劳动关系学院)超星尔雅学习通网课章节测试答案.docx VIP
- 绥中电厂专用铁路代维修及运营工作实践.docx VIP
- KPMG Graphics Library毕马威-模板经典.pptx VIP
有哪些信誉好的足球投注网站
文档评论(0)