施工的工艺流程(Construction process).docVIP

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
施工的工艺流程(Construction process)

施工的工艺流程(Construction process) Construction process Circuit reconstruction construction process 1, positioning: for various lines shift transformation, should first determine the line terminal socket position, and in the wall marked the exact location and size, and then to the nearest similar socket lead. 2 slot on the wall: should first pop-up control line, and then cutting red marble machines, artificial groove, groove depth should be the same, the straight slot line. 3 add casing: the wiring must be reinforced when installing, and the casing should be tight and smooth. Right angle eight bend should be horn of medial incision, incision in the side arc bending interface after installation. 4 fixed concealed: after the wire is loaded into the sleeve, it shall be fixed with a wire clip, first fixed inside the wall and behind the wall, and then concealed or covered with skirting boards to conceal the corners. The 5 test: all ready and wires and switches, sockets, lamp test connection, wiring to prove correct, will cut through the wall with cement flat. Key points: wire to add casing, should be FireWire, switch, zero line into the lamp holder and left zero right fire provisions of wiring, high power appliances should be set up separately, the strong and weak electricity can not be laid with the pipe. Water, Mason, carpenter continued later! Waterway reconstruction process 1. slotted opening: first according to the design requirement of pipeline transformation, in the center of the wall surface with no marked wall through hole, the cross line written on the wall, with percussion drill holes, hole center coincides with the center line of the pipeline wall. 2.: to pipe water pipe installation will first clean before installation, the installation should pay attention to the quality of interface, and identify the elbow, and the fitting position and orientation to ensure preservation after the installation of water equipment connected to protect the position of right. 3. tes

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档