施工放线(工地实用)(Construction release (site utility)).docVIP

施工放线(工地实用)(Construction release (site utility)).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
施工放线(工地实用)(Construction release (site utility))

施工放线(工地实用)(Construction release (site utility)) Stringing technique Building construction line laying out is one of the basic skills of construction management personnel. Every construction project starts with the construction and positioning of the building. It concerns the success or failure of the whole project. The phenomenon of dislocation of houses due to line errors can not meet the requirements of functional facilities. Construction line laying out is a vital link to ensure the quality of the project. The following discussion of building construction survey wire laying technology. 1 general rectangular building Stringing Technology The first step is the construction of line 1.1 coordinate location planning review general construction plan drawn by the planning, technical personnel and site positioning, planning positioning is the theoretical value of the actual position and the building site is different, must check and correct. As of 2005 by the company to undertake the construction of Guangxi Duan County Peoples government office building project, according to the planning of fixed line, a long arc dislocation 100cm, unable to agree. Because the area is large, size, with the coordinate design theory error, design corrections, re planning points, to put on the line, the square outside connected with not only consistent, according to the actual adjustment right, which lasted more than 10 days to correct. The need to put the correct positioning of the line engineering construction company and the Education Bureau of Hechi city residential building, Jinchengjiang food company residential buildings and so on, it can not be fully in accordance with the planning point on the line and to determine the location of the intention of comprehensive design, according to the actual situation of the scene, and the control points to draw out the building outside, protect the pile position. The 1.2 and second step is to determine Building axis and elevation. The conventiona

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档