- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
液压支架操作(Hydraulic support operation)
液压支架操作(Hydraulic support operation) Two, operation procedures Send the power to PM32, observe whether the PM32 display is normal or not, if not normal, do it in time. Observe whether the bottom plate is smooth and the roof pressure is too large, so as to decide which operation mode to use. If the roof pressure, broken, uneven floor, you may not use linkage, support group up operation. Single frame non automatic control Operation procedure: The first step: choose the frame according to the number of 1 keys (select left frame) or 2 keys (which selected digital frame) The second step: send operation command: 1) use the keyboard shortcuts to send commands A drop post B key shift C lift column D key shift + lift base E key drop column + lift base F key balance jack 7 button balance jack 8 keys received the first guard plate (for end head for telescopic beam) The first 9 key stretch guard plate (for end frame for stretch shrink beam) L key pushing 2) and other operations: bring up the corresponding menu item, send the command SIDESEAL, IN, OUT, side guard board with K key or M key LIFTING ON lift the base SH-SPRAY ON spray FLIPPER2 IN OUT second retaining panels for extension and extension BALANCE IN OUT carries the inter frame jack or end to side guard plate and extension Be careful: 1, in the whole process of action, we must continue to press and hold the corresponding command button, do not let go, let go of the action, that is, stop. 2, this frame slides, as long as the direct press L key, this frame push slip lasts 5 minutes automatically stop, if you need to stop early, and then press L key. 4, the adjacent automatic sequence (fall - rise -) linkage control Operation procedure: The first step: choose the frame according to the number of 1 keys (select left frame) or 2 keys (which selected digital frame) The second step: press the start button 5 、 group automatic control Operation procedure: The first step: Select function * according to the number 9 key - select aut
您可能关注的文档
- 施工放线(工地实用)(Construction release (site utility)).doc
- 施工的工艺流程(Construction process).doc
- 旅游知识问答(Travel quiz).doc
- 施工放线之内控法怎样操作施工放线之内控法怎样操作(How to operate the internal control method of construction line and how to operate the internal control method).doc
- 旅游网络公共关系营销探索(Exploration of public relations marketing in Tourism Network).doc
- 旅游规划应着力的八个要点(Eight points to be stressed in tourism planning).doc
- 施工残忆(Construction remnant).doc
- 无心磨床加工的磨削缺分析(Analysis of grinding loss in centerless grinding machine).doc
- 无损检测标准一览表(List of standards for nondestructive testing).doc
- 无比打字口诀(Very typing formulas).doc
- 18.1.2分式的基本性质第1课时(分式的基本性质)(教学课件)数学人教版2024八年级上册.pptx
- 9.1社会责任我担当(教学课件)-【新教材】2025-2026学年八年级道德与法治上册同步PPT课件+教学设计.pptx
- Unit+8(单元解读课件)英语人教版八年级上册.pptx
- 串讲03+对圆的进一步认识(期中复习课件)九年级数学上学期青岛版.pptx
- 10.2+捍卫国家利益(课件)-2025-2026学年八年级道德与法治上册高效备课优质课件+教学设计(统编版2024).pptx
- 28.2.2+应用举例(第1课时+仰角俯角)(教学课件)数学人教版九年级下册.pptx
- Unit4+Section+B+2a-2e+课件2025-2026学年鲁教(五四学制)英语八年级上册.pptx
- 6.1碳单质的多样性(第一课时)课件--2025-2026学年九年级化学人教版(2024)上册.pptx
- 9.百草园到三味书屋-2025-2026学年七年级语文上册精品教学课件(统编版2024).pptx
- Unit 5 课时4 Section B(1a-1f)阅读课课件-八年级英语上册【趣味课堂】精品课件(新人教版).pptx
有哪些信誉好的足球投注网站
文档评论(0)