排水管材的质量控制(Quality control of drainage pipe).docVIP

排水管材的质量控制(Quality control of drainage pipe).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
排水管材的质量控制(Quality control of drainage pipe) (a) common quality problems; The poor quality of pipe, cracks or partial loose concrete, compressive strength, anti permeability ability, easy to be crushed or seepage, the diameter of big dimension deviation, an easy wrong port tube. (two) quality control measures; 1. pay attention to pipe material inspection. Requirements of the construction unit selection of regular manufacturers of pipes, and check the pipe factory certificate and inspection mechanical test reports and other information is complete. 2., pay attention to the appearance of pipe inspection. When the pipe comes into play, the Engineer shall check the appearance of the pipe, and the pipe shall not be damaged, peeled, honeycombed, cracked or cracked, and shall not be used in the case of unqualified inspection of the pipe. 3., strengthen the protection of pipe. The manufacturer shall be required to strengthen the protection of the pipe in the process of pipe transportation and installation. Two 、 quality control of measuring line (a) common quality problems; Measuring error or accidentally avoiding the original structure, causing the pipeline to produce position deviation on the plane, and the slope is not smooth on the surface. (two) quality control measures; 1., the line should be re tested. After measuring the center line and the location of the inspection well, the surveyor shall make a retest, and the error can meet the requirements of the specification before allowing the next step to be built. 2., more communication. When a building is to be avoided in the course of construction, the supervision unit and the design unit shall consult with the design unit to set up a connecting well in the proper place, and the connection angle shall be greater than 135 degrees. Three 、 quality control of groove excavation (a) common quality problems; Some quality problems of slope collapse, the bottom of the tank, the water tank bottom overbreaking, trench section does

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档