加固工作存在的问题(Problems existing in reinforcement work).docVIP

加固工作存在的问题(Problems existing in reinforcement work).doc

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
加固工作存在的问题(Problems existing in reinforcement work)

加固工作存在的问题(Problems existing in reinforcement work) Problems existing in reservoir reinforcement work and suggestions My district is a large agricultural area and water conservancy area, a total of 160 reservoirs, including: large (two) type 2; medium-sized 7; small (a) and small (two) type 151. Reservoir reinforcement is the peoples livelihood project, not only related to the safety of the peoples lives and property in the lower reaches of the reservoir, but also related to the important agricultural infrastructure construction in the reservoir area. In the past two years, the state has implemented a proactive fiscal policy, and I have seized the opportunity, including 21 large and small reservoirs in the central special plan. The big 1 (Red River), and 6 (black river, Liu Yan, Luo Gang, Qin Ju, Fan Zhuang, Guan Gou), a type 14 (tiger, three and six when Dong Chong, Sun Zhaowan, Yi, Zhuang, Liu Po leaf, Chenggang mountain, Mi Wan Hu, Yang Zhuang, Chen Peng, Gou, booming dam, Dai Wan). As of the end of June the reservoir reinforcement project 70% before the arrival of the main flood season has been completed and acceptance, both to ensure the safe operation of the reservoir, and promote stability in my area farmers harvest, the effect is obvious. First, the existing problems and reasons Reservoir reinforcement project in our area is large, involving a wide range, many factors restricting construction, special requirements for the construction period, although the efforts of all parties, but the existing problems are still prominent. 1 、 the project schedule is out of step with the plan. The year 2008 projects, and medium-sized reservoirs in black river, Liu Yan, Guan Gou has completed the main project, but Luo Gang reservoir anti-seepage wall and the corresponding part of the dam crest slope, as of now has not been completed. (a) small reservoir, three, six when the tiger Dong Chong, Sun Zhaowan, Yi Po shares the main part of the project completed in 09 years, has be

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档