兰大《工程项目管理》13春在线作业1(Lan Da, project management 13 spring online homework 1).docVIP

兰大《工程项目管理》13春在线作业1(Lan Da, project management 13 spring online homework 1).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
兰大《工程项目管理》13春在线作业1(Lan Da, project management 13 spring online homework 1)

兰大《工程项目管理》13春在线作业1(Lan Da, project management 13 spring online homework 1) 14 spring 13 autumn big orchid project management 13 spring online homework 123 Total score: 100 test time: - Radio examination A multiple-choice question Judgment question Radio examination questions (15 questions, 30 points). Radio) 1., the starting time of the project generally refers to () A. construction teams time to enter the site B. temporary facilities break ground Breaking ground for any permanent project in the C. design D. commencement ceremony Full marks: 2 2., after the completion of the project, () to the construction unit to submit the project completion report, apply for completion of the project acceptance A. construction unit B. supervision unit C. owners D. construction administration department Full marks: 2 3., the relationship between investment, quality and schedule objectives of construction projects is () A. opposition B. unification C. unity of opposites D. doesnt matter Full marks: 2 4., the essential content of water flowing construction is () A. division of labor collaboration B. mass production C. continuous operation D. lapped properly Full marks: 2 5. the survey and design units may submit (or) organize reconsideration when they have objections to the examination opinions. A. Planning Division B. consulting unit C. Railway Administration D. construction unit Full marks: 2 6. the two nodes in the code network that have both an outward arrow and an inward arrow line are () A. start node B. end node C. intermediate node D. arbitrary node Full marks: 2 7. for the Tendering Company, the contents of the bid documents submitted by the tenderer shall not be considered as the scope of the bid evaluation A. tender letter B. tender offer C. construction organization design D. construction safety management plan Full marks: 2 8. the cold drawing of steel bar is to stretch steel bar at normal temperature A. improves strength and saves steel B. easy construction C. in order

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档