供电专业防寒题(修改版)(Cold problems for power supply (Revised Edition)).docVIP

供电专业防寒题(修改版)(Cold problems for power supply (Revised Edition)).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
供电专业防寒题(修改版)(Cold problems for power supply (Revised Edition))

供电专业防寒题(修改版)(Cold problems for power supply (Revised Edition)) Radio: 1 contact net work near the railway line in the winter, are not allowed to put down the protective cap ears. You must wear C when you work. A insulating appliances, B work clothes, C protective articles, D safety appliances 2 the number of workers engaged in deicing operations shall not be less than (A), one person operation, one person guardianship, one person protection. A three people, B one person, C two, D four 3 the work of deicing on OCS shall be carried out (B) work order and the reclosing of relevant sections shall be removed. A no power off, B indirect live C, away from D power cut 4, contact network workers in the spring thaw, should pay attention to spring melt situation, to prevent the spring melt caused by inverted rod, (A). Collapse, collapse, foundation settlement. A broken line; B; inverted rod; C collapse; D foundation settlement 5 contact net work when bad insulation contact net, in its pillar, supporting structure and metal structure, the connection point in the return line and rail, are likely to occur, therefore, the usual (D) should avoid contact with these components, when the catenary insulator damage, no contact. A low voltage B low current C voltage free. D high voltage 6 contact network worker, in low voltage live operation, allowing load connection (C). A ground wire B, high voltage C, low voltage D lead wire 7 contact electrical equipment, if there is a fire, first (B), to ensure the safety of fire fighting personnel and prevent the spread of fire. A discharge, B cut off power, C shutdown device, D disconnect loop 8 contact the net worker winter high altitude safety work, check whether the ladder and ladder meet the requirements, firm, light and stable. Before climbing, to check the status of the pillars, select the direction and conditions of climbing, climbing hands firmly, pedal steady. With feet and pedal climbing, to prevent the truck tight, fall, climb to try to

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档