公路施工组织设计档(Highway construction organization design file).docVIP

公路施工组织设计档(Highway construction organization design file).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
公路施工组织设计档(Highway construction organization design file)

公路施工组织设计档(Highway construction organization design file) Construction organization design I. General Situation of the project Chen Li highway toll station Dafeng bid 1 project is divided into two parts and the station outside the station. The details are as follows: station, a total length of 140 meters, 20CM trough, 60CM roadbed, 10% 15CM 15 CM 12% lime soil, lime soil, 15CM two ash gravel, 0.5CM seal, 20CM cement concrete slab. Outside the station, a total length of 750 meters, 20CM trough, 60CM roadbed, 10% 15CM 15 CM 12% lime soil, lime soil, 0.5CM seal, 3.0CM asphalt layer. The main works of this project are: Excavation: 4.30 KM3 Bottom tank treatment: 4 KM2 Backfill compacted earth: 2.40 KM3 10% lime soil: 3.33 KM2 12% lime soil: 3.10 KM2 Two ash crushed stone: 1.68 KM2 Asphalt under seal: 3.10 KM2 Cement concrete pavement: 437 M3 Asphalt concrete: 0.45100 M3 Two, engineering features Short duration, heavy task, uninterrupted traffic, high safety requirements. Three, project management deployment and overall arrangement In order to ensure the engineering quality and quantity can be implemented smoothly, on-site project manager, Luqiao Corporation appointed leaders in charge of permanent construction site, supervision and guidance, project manager according to the companys quality management system to set up job functions, the implementation of the project manager responsible for the implementation of ISO9002 management system, mode of operation, management and construction closely, ensure project overall, the whole process of the implementation of the organization, detailed drawings of the project manager Dept. (1). 1 、 construction team arrangement and road operation plan Our company is located in the construction of Nanyang Town, 650 meters east of the red flag. The construction period is two jobs, according to the needs of the construction time, the quality and quantity of the premise, in order to speed up the progress in the construction of lime soil, addi

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档