- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
工程施工企业会计核算方法(Accounting methods for construction enterprises)
工程施工企业会计核算方法(Accounting methods for construction enterprises)
Accounting methods for construction enterprises
I. General description
(a) to the accounting standard for construction enterprises, according to the Peoples Republic of China accounting law, Regulations on financial accounting reports of enterprises, enterprise accounting system and relevant state laws and regulations, combined with the actual situation of construction enterprises, construction enterprises accounting measures formulated (hereinafter referred to as the measures ).
(two) construction enterprises in Peoples Republic of China shall, when carrying out the enterprise accounting system, establish accounting methods for construction enterprises at the same time
These Measures shall be implemented.
Edit this paragraph using instructions two, supplementary accounting instructions
(1) the setting of accounting subjects;
1. of these measures in the enterprise accounting system are added on the basis of materials and temporary facilities, temporary facilities, temporary facilities, amortization clean up , settlement , construction and mechanical work subjects.
2. according to the provisions of the enterprise accounting system, the construction enterprise engineering project contract confirmation of income and contract costs through main business income and main business cost accounting subjects, these measures were added to the accounting content. The project construction contract is expected to be ready for the loss by adding the contract for loss preparation under the inventory depreciation reserve account.
3. construction enterprises may, according to their own needs, set up funds allocated by their own departments, higher funds allocated by the higher authorities and internal contacts.
(two) instructions for the use of supplementary accounting subjects
1233 turnover materials
1. This account calculates the actual cost or planned cost of the construction stock and the various revolving materials in
您可能关注的文档
- 太甲放逐桐宫(Exile Palace).doc
- 太极宗师金仁霖论太极拳的练法(Tai Chi Master Jin Renlin on Taijiquan training).doc
- 太极拳运劲发力规律(Tai Chi strength force law).doc
- 太空船月球(Spaceship moon).doc
- 太湖北部夏季浮游藻类多样性与水质评价(Phytoplankton diversity and water quality assessment in northern Taihu in summer).doc
- 太阁5能力培养大法(Our 5 ability training method).doc
- 太阳能上水须知与技巧(Notes and techniques for solar water supply).doc
- 太阳能公司(Solar energy company).doc
- 太阳能制造厂家(Solar manufacturers).doc
- 太阳能科技论文新能源开发利用论文能源科学导论论文云南太阳能热水(Solar energy science and technology paper new energy development and utilization paper Energy Science Introduction Yunnan solar hot water).doc
- 工程测量1(Engineering Survey 1).doc
- 工程测量》在线作业二(Engineering survey online homework two).doc
- 工程热力学大纲(Outline of Engineering Thermodynamics).doc
- 工程招投标工作总结(Project bidding work summary).doc
- 工程经济1(Engineering economy 1).doc
- 工程管理论文格式(Format of engineering management papers).doc
- 工程绘图教程(Engineering Drawing Course).doc
- 工程制图与cad实验(中)(Engineering graphics and CAD experiment (Part one)).doc
- 工作总结社区创建工作总结(Job summary, community creation, work summary).doc
- 工程量清单与定额计价模式的比较(Comparison of bill of quantities and quota pricing model).doc
文档评论(0)