曹家沟黄土大断面隧道施工参数优化研究.pdfVIP

曹家沟黄土大断面隧道施工参数优化研究.pdf

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
曹家沟黄土大断面隧道施工参数优化研究论文

Subject : Study on Construction Parameter Optimization of Large Cross-section Loess Tunnel Cao-jiagou Specialty : structural engineering Name : Li Bao-ping (Signature) Instructor : Wang Xiao-lin (Signature) ABSTRACT The design, construction and operation of large cross-section of loess tunnel often encounter a number of difficulties and problems due to its large area and unfavorable conditions of surrounding rocks. The loess tunnels at the present day are often constructed with traditional methods which are featured by complex procedures and slow progress. Whereas the three-bench seven-step excavation method can display its unique advantages under such geological conditions. But the study on the optimization of construction parameters is far from adequate, which becomes an important topic for study in the project of large cross-section loess tunnel. This thesis summarizes the properties of loess, deformation features, surrounding rock pressure and major disasters of loess tunnel. Apart from the study on the definition and construction methods of a large cross-section tunnel, it makes comparison of the traditional construction methods of loess tunnel and proves the reliability of three-bench seven-step excavation method applied in Cao-jiagou Tunnel project. Then it focuses on the process and main points of three-bench seven-step excavation method. Drawing the experience of the large cross-section loess tunnel of the ongoing Cao-jiagou railway project, it takes numerical simulation analysis on the supporting

文档评论(0)

chenchena + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档