- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
肯定关键门路图(国外英文资料)
确定关键路径图(国外英文资料)Critical PathWhat is the critical pathIn project management, the critical path is refers to the network terminal sequence of elements, this series has the longest and determine the total duration of the entire project completed in the shortest time.The period of the critical path determines the duration of the project. The delay of the terminal elements on any critical path will directly affect the projects expected completion time (for example, no float time on the critical path).A project can have multiple, critical paths in parallel. Another parallel path, which is slightly less than the critical path, is called the secondary critical path.Initially, the critical path approach only considers the logical dependencies between the terminal elements. Resource constraints are added to the key chain method.The critical path method was invented by dupont.Key line characteristicsKey routes have the following features:1, the duration of the activity on the critical route determines the duration of the project, and the duration of all activities on the critical route adds up to the period of the project.Any activity on the critical route is a critical activity, and any delay in any activity can lead to a delay in the completion of the project.3, critical path from the starting point to the route of the project at the end of the longest route, so if you want to shorten the construction period of the project, must be on the critical path to find a way to, on the contrary, if the critical path takes longer, is the entire project completion date will be extended.The time required for a critical route is the shortest amount of time you can complete a project.Activities on key routes are the least of the time.Explore the critical pathThe vertex represents the event, the arc represents Activity, and the weight On the arc indicates that the Activity is called the Activity On Edge Network. AOE is used to estimate the completion time of the project. Such as:Figure 1 i
您可能关注的文档
最近下载
- 2022年初中数学趣味数学竞赛课件(共43张ppt).pptx VIP
- 新员工三级安全教育培训(岗前)PPT课件.pptx VIP
- 常用电气形符号表.doc VIP
- DBJ51-143-2020 四川省公共建筑节能设计标准.pdf VIP
- 黑龙江建设工程安全文明施工费使用管理办法.doc VIP
- 《新能源汽车电机及控制系统检修》 课件 模块3 驱动电机控制系统检修.pptx
- TSGZ8001—2019特种设备无损检测人员考核规则(去水印版).pdf VIP
- 企业工会助推企业高质量发展.docx VIP
- 《新能源汽车驱动电机及控制技术》 课件 3.1 电机控制器检测与故障诊断.pptx
- GB∕T 5777-2019 无缝和焊接(埋弧焊除外)钢管纵向和∕或横向缺欠的全圆周自动超声检测(含2021年第一号修改单).pdf
文档评论(0)