空心砌块填充墙工艺标准(国外英文资料).docVIP

空心砌块填充墙工艺标准(国外英文资料).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
空心砌块填充墙工艺标准(国外英文资料)

空心砌块填充墙工艺标准(国外英文资料) Hollow block filling wall process standard Number: QHJT - GYBZ - 001 Version: first edition Release date: January 8, 2015 Implementation date: March 1, 2015 Small hollow block filling wall process standard 1 scope This standard applies to the property group project (G0302). 2 preparation of purpose 2.1 specification of light aggregate concrete small hollow block filling wall construction method, improving the construction quality of the group, reducing empty drum and cracking hidden danger. 3 compilation basis 3.1 construction quality acceptance specification (gb50203-2011) Light aggregate concrete small hollow block (GB/t15229-2011) 33.3 concrete small hollow block building technology discipline (JGJ/t14-2011) 3.4 framework fill wall design and construction technical discipline (DB11 / t742-2010) 3.5 frames fill the wall light block (08bj2-2 atlas) 4 construction practice Construction practices and critical node requirements 4.4.1 Parts of the Practices and regulations 1 the roots of guide wall A. dry-wet alternate parts such as the wall between lavatory bath root cast-in-situ concrete C20 element of the camp, with wide wall thickness, height not less than 150 mm, the design drawings have clear requirements, the height according to the construction design drawing B. other parts are masonry brick wall or C20 fine stone concrete 2 lintel and coping The upper part of the window and door opening is suitable to pass through the wall through the wall, and it is connected to the main structure. A: when the width of the window is less than or equal to 1.5m, the beam is used to configure 3 phi 10 reinforcement as the beam, and the band is phi 6@ 200 B. 1.5 m L 3 m or block thickness of 90 or less, the bare cast-in-situ lintel, lintel height of 200 mm, the width of the wall thickness, 4 Ф 12 longitudinal reinforcement, stirrup phi 6 @ 200 C. the wall is not less than 250mm at the end of the beam, the width of the wall is wider than the width of the wal

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档