- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
修建工程逆作法(国外英文资料)
建筑工程逆作法(国外英文资料)
After excavation, it is found that the eccentricity is larger.
Economic performance
USES uni-axial, general basement wall and foundation pit enclosure wall in the form of the joining together of two walls, on the one hand out the separate enclosure wall, on the other hand can within the scope of construction land and maximise the basement area and increase effective use area. In addition, the support system of the enclosure wall is replaced by the basement floor structure, which saves a lot of support cost. And floor structure of the support system, can also solve the special plane shape building, or local floor loss brought about by the support of difficulty, and is more reasonable. Because of these reasons, and the total construction period shortened, thus in soft soil area for high-rise building with multistory basement, using uni-axial has obvious economic benefits. You can save 25% to 35% of the total cost of underground structures.
Environmental benefits
Aspects: (1) the noise due to uni-axial during construction of the basement is to use first floor surface integral casting, and down excavation, so the noise due to the surface of floor of block in the construction is greatly reduced, so as to avoid the delay time limit for a project for night construction noise problem.
(2) dust: the usual ground treatment is open and open, creating a lot of construction dust, which affects the image of the city. Using reverse course construction, due to its construction operation under closed surface, the dust can be reduced to maximum extent.
Social benefits
(1) transport: due to uni-axial take surface support, at the bottom of the construction method, so the scope for in city traffic construction, it will continue to be opened to traffic on the ground, hoof, road underground operations, avoiding the loss due to traffic jam around.
(2) using the reverse course, the + 0.00 plate structure is finished first and can be supported by the structure itself. Becaus
您可能关注的文档
最近下载
- Linux网络操作系统配置与管理 第四版 项目3 文件和目录的管理.ppt VIP
- 医学课件-肝功能衰竭.pptx VIP
- 《保教政策法规与职业道德》中职幼儿保育专业全套教学课件.pptx
- 肝功能衰竭医学科普.pptx
- 2024-2025学年广东省深圳中学九年级(上)开学数学试卷(含详解).pdf VIP
- 《肝功能衰竭》课件课件-2024鲜版.ppt VIP
- 通桥(2014)2132-Ⅳ(跨度31.5m) (附条文及目录 ).pdf VIP
- 儿科学麻疹病例分析,病例导入法.docx VIP
- 燃煤锅炉超低排放治理工程项目实施方案(参考).docx
- 24012NDS00 NDS试验测试标准.doc VIP
文档评论(0)