工程完工验收交底(国外英文资料).doc

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
工程完工验收交底(国外英文资料)

工程竣工验收交底(国外英文资料) The inspection and acceptance of the project is completed In order to complete the construction of the project, the inspection and acceptance of the construction project will be carried out smoothly. One, unit project acceptance is organized and presided over by the construction unit; The requirements for the acceptance of unit projects shall be: To complete the contents of the project design and contract agreement; The construction unit inspected the quality of the project after the completion of the project, and put forward the project completion report. The supervising unit evaluates the project, has the complete supervision data, and puts forward the project quality assessment report. 4, survey, design units in the process of survey, design documents and construction design change notice signed by the design unit, and puts forward the quality inspection report. Having complete technical archives and construction management materials; Report on the entrance test of major building materials, construction components and equipment; Paying the project money according to the contract agreement; Sign the quality assurance books of the project; It has been completed by means of planning, fire fighting and environmental protection. The quality safety supervision station ordered the rectification to be completed. The inspection and acceptance of the housing project is completed in accordance with the inspection rules for the quality of the housing project in jiangsu province. Three, the condition of complete, the construction units and engineering construction, supervision, survey, design units, coordinate arrange held scheduled completion inspection and acceptance of time; At the same time, more than seven days before the date of the completion of the completion of the project, the inspection and acceptance notification of the unit (subunit) project shall be provided to the quality safety supervision station of the project. At the same time, the examina

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档