工程完工验收应具有的前提和请求(国外英文资料).doc

工程完工验收应具有的前提和请求(国外英文资料).doc

  1. 1、本文档共6页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
工程完工验收应具有的前提和请求(国外英文资料)

工程竣工验收应具备的条件和要求(国外英文资料) The requirements and conditions for the inspection and acceptance of the project shall be completed First, the construction unit shall submit the completed report; The main content should include: To verify the quality of the project and confirm that the quality of the project conforms to the compulsory standards for the construction of relevant laws, regulations and projects; Comply with design documents and contract requirements. The project manager and the relevant principal of the construction unit (the legal person representative or the enterprise technical director) shall verify the signature. And attached: the unit project quality is completed and the acceptance record; Verification records of the quality control data of the unit project; Unit engineering safety and functional inspection data checking and main function checking records; Inspection records of the quality of observation of the unit project; Inspection records of quality management in construction site; Records of the acceptance of the basic and intermediate structures. 2, supervision assessment report: the chief engineer and the supervising unit concerned shall verify the signature. Three quality inspection report, survey, design units: in the process of survey, design documents and construction design change signed by the design unit check contact list, must be approved by project director and relevant units, head of the signature. The engineering and technical records are complete and complete. Documents approved by the citys archives department. Report on engineering inspection and inspection. The construction unit has paid the project money in accordance with the contract. The quality assurance books signed by the construction unit. The planning department issues the approved document. Approval documents issued by departments of public security fire control and environmental protection, or permit the use of documents. The competent departments of construction admini

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档