剪力墙工程细部处理与通病防治浅说(国外英文资料).docVIP

剪力墙工程细部处理与通病防治浅说(国外英文资料).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
剪力墙工程细部处理与通病防治浅说(国外英文资料)

剪力墙工程细部处理与通病防治浅说(国外英文资料) The engineering detail treatment and the prevention and treatment of disease (one of the brief series) When the spring wind is warm and everything is recovering. The project of xianglin water bank is fully developed. Present tense warmly and orderly gratifying situation, for the whole project implement total quality management, further deepening for site engineering technical management, briefly introduced the construction series, as a routine disclosure. For reference. And they are very carefully implemented. The ability to provide points for each department. It is our intention to upgrade the quality management of the whole project. Frame shear wall structural detail and disease: During the construction of the project. Often arise 1. The shear wall is not straight, (2) on the lower shear wall displacement, wrong table, uneven, such as shear wall horizontal construction joint seams, elevator shaft side stair parts, such as this kind of phenomenon. 3. The shear wall plane twisted, cut the hole not founder, the hole expansion mode, 4. The shear wall at the bottom of the slag, roots rotted, the production of such a problem, will seriously affect the quality of construction engineering, in order to solve these problems, draw lessons from the optimization of the reasonable construction measures, the summary of construction experience, the following preventive measures are proposed according to engineering structure design features: (1) the wrong table on the wall of the shear wall, the concrete wall, the shaft wall of the elevator and the concrete wall of the stairway, etc. At the top of the lower wall wall, the pull bolts are set. In order to use this bolt and the wall to tighten the wall of the wall. For the outside of the frame column, the bottom concrete is cast. Place the preset bolt at the top of the floor, 100 to 200 mm. In the match mode, the lower part of the position is increased by 200 to 300mm. When the template is set, the bottom o

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档