人工挖孔桩钢筋绑扎技巧交底(国外英文资料).doc

人工挖孔桩钢筋绑扎技巧交底(国外英文资料).doc

  1. 1、本文档共18页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
人工挖孔桩钢筋绑扎技巧交底(国外英文资料)

人工挖孔桩钢筋绑扎技术交底(国外英文资料) Technical background The name of the project The construction unit Supervision unit Construction unit Clarificaiton parts Date of disclosure Professional subcontractor The project leader Content of the disclosure: The construction and installation technology of the pile reinforcement is in the background A, reinforced The variety and specifications are in accordance with the design requirement, and have the factory certificate and the test report, as well as the raw material inspection certificate. Second, the main machine tools Rebar processing machine, welding machine Working conditions To read the drawings, and to control measures and plans for the construction of the key parts, to summarize the drawings, and to get the exact reply. To make hole and wall check, check and check the pile hole, and agree to enter the construction of the next process. No construction is allowed without qualification. The main points of construction operation 1. The cleaning The surface of steel reinforcement should be cleaned by oil, paint, rust, and floating skin before it is processed. Rebar rust can be used to remove rust. 2. The straightening The steel bar should be straightened, such as the partial bending degree exceeding the standard, should be straightened to be usable. 3. The bending forming The error shall be within the prescribed scope according to the specifications and dimensions of the drawing and the ingredients list. Disclosure of The quality of security The production manager technology Answer the bottom one time Technical background The name of the project The construction unit Supervision unit Construction unit Clarificaiton parts Date of disclosure Professional subcontractor The project leader Content of the disclosure: Fifth, the steel cage construction technology First, the steel cage processing Material: the steel bar is strictly designed in all parts and shapes. It is necessary to ensure the accuracy of the cut. Weld connection: the pile

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档