- 1、本文档共18页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
人工挖孔桩钢筋绑扎技巧交底(国外英文资料)
人工挖孔桩钢筋绑扎技术交底(国外英文资料)
Technical background
The name of the project
The construction unit
Supervision unit
Construction unit
Clarificaiton parts
Date of disclosure
Professional subcontractor
The project leader
Content of the disclosure:
The construction and installation technology of the pile reinforcement is in the background
A,
reinforced
The variety and specifications are in accordance with the design requirement, and have the factory certificate and the test report, as well as the raw material inspection certificate.
Second, the main machine tools
Rebar processing machine, welding machine
Working conditions
To read the drawings, and to control measures and plans for the construction of the key parts, to summarize the drawings, and to get the exact reply.
To make hole and wall check, check and check the pile hole, and agree to enter the construction of the next process. No construction is allowed without qualification.
The main points of construction operation
1. The cleaning
The surface of steel reinforcement should be cleaned by oil, paint, rust, and floating skin before it is processed. Rebar rust can be used to remove rust.
2. The straightening
The steel bar should be straightened, such as the partial bending degree exceeding the standard, should be straightened to be usable.
3. The bending forming
The error shall be within the prescribed scope according to the specifications and dimensions of the drawing and the ingredients list.
Disclosure of
The quality of
security
The production manager
technology
Answer the bottom one
time
Technical background
The name of the project
The construction unit
Supervision unit
Construction unit
Clarificaiton parts
Date of disclosure
Professional subcontractor
The project leader
Content of the disclosure:
Fifth, the steel cage construction technology
First, the steel cage processing
Material: the steel bar is strictly designed in all parts and shapes. It is necessary to ensure the accuracy of the cut.
Weld connection: the pile
您可能关注的文档
- 一级注册结构工程师测验科目及纲目(国外英文资料).doc
- 一年级语文下册 灯塔爷爷的同伙2教案 冀教版(国外英文资料).doc
- 一级结构纲目(国外英文资料).doc
- 一线进口品牌黑色多普勒参数(国外英文资料).doc
- 一结构考纲及标准(国外英文资料).doc
- 【资本】碳青霉烯类抗生素的临床应用沾染性与沾染性疾病评论辩论版(国外英文资料).doc
- 一维定长悬索题目标无限元法求解①(国外英文资料).doc
- 一级建筑师《项目治理》第二章第三节演习题(国外英文资料).doc
- 一道秀丽的弧线划过面前(国外英文资料).doc
- 一钢轧厂临盆TC420L、T420L 汽车大梁用热轧钢带工艺操纵规程(国外英文资料).doc
文档评论(0)