冰铜磨翻译.docVIP

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
冰铜磨翻译

1. Introduction简介 As since the first exchange of roller tires the mill is running completely different than before, the client ordered a service to find out the reason for that and to introduce measures to come back to the original point of operation.For this reason Mr. Schwarz travelled to Tongling and carried out a 2-days-service in the plant.由于自从第一次更换滚筒导致运行与之前完全不一样,客户寻求我们寻找问题解决问题的帮助,以便恢复为原始的运行状态,为此施瓦茨先生来到铜陵进行为期2天的现场指导服务。 2. History历史 The mill has been commissioned in February 2013. During the first operating hours there was a high vibration level of the mill as well as a high amount of rejected material from the mill. 冰铜磨于2013年2月投产,在运行的初期,冰铜磨的振动系数高并且还有高数量的返料。 By increasing the dam ring height from 90mm to approximately 110 mm the vibration level and the reject quantity could be reduced.通过将挡料环的高度从原来的90mm增加到大约110mm,振动系数和返料都得到减少。 Furthermore it was possible to control the amount of reject with the airflow. During the commissioning it has been tested in which range the feed can vary as the furnace capacity behind the mill can also change, so the mill doesn’t need to be stopped. 此外,通过气压调节这能控制住返料,在调试期间曾进行了冰铜磨后面的数据输入的改变可以适应炉子容量的改变,所以冰铜磨不需要停机。 A feed range between 60 t/h and 110 t/h could be achieved and the mill was running smooth and stable.进料量从60t/h到110t/h都可以实现,在此范围冰铜磨能够平稳的运行。 In October 2013 the Performance Test has been carried out where the guaranteed figures could be reached.在2013年10月保证数据都能达到的实验已经进行。 In May / June 2014 the client did change the roller tires under Loesche supervision.The tires have been manufactured by a local company and the measurements were different to the originals as the tires did touch the support ring. To solve that,在2014年5/6月,客户在我公司的指导下将滚子更换,滚子是由当地的一个公司制造,为了解决由于滚子碰到了支承环的问题,滚子的尺寸数据与我公司当初的有所改动。 distance rings had been installed at the roller shaft as follows: roller 1 – no ring, roller 2 – 6mm ring, roller 3 – 12 mm ring.间隔环在滚筒上已经安装,具体如下: 1#滚筒----没有,2#滚筒----6mm环,3#滚筒----3-12mm。 There were no other modification works in the mill during that

文档评论(0)

haihang2017 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档