余热发电操作规程-中英文教程.docxVIP

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
余热发电操作规程-中英文教程

目录1.Reference22.Brief on the system process系统流程介绍23.Process flow chart流程图34.Preparation before auxiliary equipment start-up辅机启动准备工作35.Temperature and pressure rising of the PH boiler窑尾锅炉升温升压36.Main steam pipes heating主蒸汽管加热37.Warming-up process准备启动过程38.Parallel in并网39.Inspection and maintenance while the turbine running汽轮机运行时的检查维护310.Inspection and maintenance while the generator running发电机运行时的检查维护311.AQC Boilers start窑头锅炉启动312.Normal shut-down procedure of turbine and generator汽轮发电机正常停机程序313.Maintenance during steam turbine shut-down汽轮机停机时的检查维护314.Inspection and maintenance during generator shut-down发电机停机时的检查维护315.Preparation before boilers stop锅炉停炉前的准备316.Inspection and maintenance during boilers shut-down锅炉停机时的检查维护3ReferenceInstruction of boiler operation锅炉使用说明Instruction of water treatment operation 水处理使用说明Instruction steam turbine generator operation instruction汽轮发电机使用说明Brief on the system process系统流程介绍The condensation water in the hot well of the condenser meets together with the water flows out from the flasher through the condensation water pump, and then flows into the economizer of the AQC boiler by the boiler water supply pump to preheat and produce the high temperature water with a certain pressure, the high temperature water flows out of the economizer is divided to three ways, namely the drum of the AQC boiler, the drum of the PHboiler and the flasher. The water flows into the drums will be circularly heated and turned to superheated steam to the turbine, the water flows into the flasher will be producedthe saturated steam by the flash effect and sent to the turbine, the rest steam will be back to the hot well and continue the circulation. The consumed water will be supplied by the pure water which pumped into the hot well from the water treatment device by the water supply pump.来自凝汽器热井中的凝结水和来自闪蒸器的水一起经凝结水泵,锅炉给水泵加压,进入窑头锅炉省煤器。省煤器出来的高温高压热水分成三路,分别进入窑头锅炉汽包、窑尾锅炉汽包和闪蒸器。进入汽包的热水经汽包循环加热,再经过热器过热后变为过热蒸汽进入蒸汽轮机。进入闪蒸器的热水经闪蒸后变为饱和蒸汽也进入蒸汽轮机。消耗的水由纯水泵从纯水处理设备中送入凝汽器热井。The

文档评论(0)

shuwkb + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档