多品种小批量轮番生产计划模型(英文).ppt

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
多品种小批量轮番生产计划模型(英文)

* 企业实践案例(英文资料): “多品种 - 小批量轮番生产” 均衡化生产计划与排程模型 Customer Production Fluctuation in lot size * Leveling method: Leveling the quantity per model and consistency of the model order. Leveling the quantity and production sequence takes place at the manufacturing resource. A preferably fine leveling simulates a ‘perfect’ customer who picks up regularly in small portions. Leveling supports the Continuous Improvement Process implying a reduction in lot size and therefore in replenishment lead time. Shortened replenishment lead times yield in increased flexibility (easy and fast adjustment to unanticipated disruptions such as changes in customer demand). Through a consistent customer demand, stock can be held on a minimum from the preliminary processes to the suppliers. * * Parameters for leveling Distinction into high and low runner: Models with high frequent and constant demand (high runner) Models with low frequent and/or uneven demand (low runner) Customer tact or demand quantity/frequency per model Capacity (offered by production ): Personnel (Shift model) MAE (OEE, change over time) Leveling period and withdrawal sequence Lot-size Planning period: replanning frequency of the leveling board Availability (parts quality, organizational interruptions, OEE) * Case study: Production program based on change over optimization - units allocation Product Current Current EPEI ? recorded number demand / month demand / day fluctuations Change over/day ? A 5,600 280 +/- 10 % B 5,600 280 +/- 50 % C 5,600 280 +/- 50 % D 4,800 240 +/- 20 % E 4,000 200 +/- 25 % F 3,200 160 +/- 20 % G 3,200 160 +/- 15 % H 2,400 120 +/- 10 % a 480 24 ? b 480 24 ? c 320 16 ? d 320 16 ? e 160 8 ? f 80 4 ? g 80 4 ? h 80 4 ? i 80 4 ? j 80 4 ? k 80 4 ? l 40 2 ? m 40 2 ? n 40 2 ? o 40 2 ? 23 TTNr. 36.800 pcs 1840 pcs * Example: How often should we produce different part numbers ? Introduction EPEI = Every Part Every Interval Current situation: 23 part numbers *) customer dem

文档评论(0)

过各自的生活 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档