国际工程FIDIC条款公路施工700章材料要求,中英文对照.doc

国际工程FIDIC条款公路施工700章材料要求,中英文对照.doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
国际工程FIDIC条款公路施工700章材料要求,中英文对照

DIVISION 700 - MATERIALS 第700部分 – 材料: SECTION 701 第 701 节 CEMENT 水泥 The Contractor shall provide suitable means for storing and protecting cement against dampness. Cement which for any reason has become partially set or which contains lumps of caked cement will be rejected. Cement salvaged from discarded or used bags shall not be used. 承包商应提供合适的手段贮存并保护水泥免受潮湿的影响。因任何原因而部分固化或含有水泥饼团的水泥为不合格。不得使用从丢弃或使用过的水泥袋中回收的水泥。 701.1 - PORTLAND CEMENT: 硅酸盐水泥: Portland cement shall conform to the requirements of ASTM C 150, Type I.硅酸盐水泥应符合ASTM C 150中第I类的要求。. 701.2 - NOT USED: 未使用混合水凝水泥: Blended hydraulic cement shall conform to the requirements of ASTM C 595 for Portland Blast-Furnace Slag Cement, Type IS, or Portland-Pozzolan Cement, Type IP.混合水凝水泥应符合ASTM C 595中对于对于第IS类硅酸盐高炉矿渣水泥的要求或是第IP类火山灰硅酸盐水泥的要求。 701.4 - MASONRY CEMENT: 砌筑水泥砌筑水泥应符合ASTM C 91的要求。. SECTION 702 第 702 节 FINE AGGREGATE 细骨料 702.1 - FINE AGGREGATE FOR PORTLAND CEMENT CONCRETE: 硅酸盐水泥混凝土细骨料: 702.1.1 - General Requirements: 一般要求细骨料应由碎石、人工砂或是两者的混合物构成,并符合本《技术规范》的要求。 The mining of river and sea sand in the area surrounding the site of the Works is generally prohibited by local regulation. Permits for such mining have to be obtained from the Divisional Secretary. The Design Consultants investigations have indicated that such local natural sources of sand would be grossly insufficient for the requirements of the Works, and would be consequent in significant environmental impact. However, provided that the necessary permits could be obtained from the appropriate authorities (including the approval of the Central Environmental Authority) there would be no specific objection on technical grounds to the use of such sources provided that the physical characteristics of the material produced shall comply with the Specifications. Bidders shall be aware that the granting of appropriate permits by the authorities concerned is unlikely, and the Employer shall bear no responsibility for the granting or refusal (or subsequent withdrawal in t

文档评论(0)

过各自的生活 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档