- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
DOI: 10.13905/j. cnki. dwjz. 2022.11. 028 硬岩地层双模式TBM卡机与脱困技术研究 DUAL-MODE TBM STICKING MACHINE AND EXTRICATING TECHNOLOGY IN HARD STRATUM 孟成龙 ,王旭春 ,孙宝杰 ,孙宏图 ,洪勇 (青岛理工大学土木工程学院 ,山东青岛266033) MENG Chenglong, WANG Xuchun, SUN Baojie, SUN Hongtu, HONG Yong (School of Civil Engineering, Qingdao University of Technology, Shandong Qingdao 266033, China) 【摘 要】为探究硬岩地层双模式TBM卡机与脱困技术 ,以青岛地铁八号线鞍山区间右线为研究对象,结合施工现场勘探及工 程勘察报告,采用辅推油缸和定点爆破的方法,对双模式TBM在硬岩地质段卡机事故原因及脱困措施进行研究 。研究结果表 明,在辅推油缸的土里作用下设备整体向前位移累积Ucm,TBM脱困失败;定点爆破的方法分为试爆、工作洞开挖、掌子面整 体开挖、盾体上方整体开挖4个步骤 。第8次爆破后向前空推爆破炸开的空洞2~3环 。TBM推进正常,证明了该方案的可行 性,研究结果可为类似双模式TBM在硬岩卡机脱困施工提供工程借鉴。 【关键词】双模式TBM;脱困;地铁隧道淀点爆破;硬岩地层 【中图分类号】TU745.3 【文献标志码】A 【文章编号】1001-6864(2022) 11-0130-05 Abstract : Taking the right line o£ Anshan section of Qingdao Metro Line 8 as the research object, the dual-mode TBM jamming and difficulty relief technology in hard rock stratum was explored・ Combined with the construction s让e exploration and engineering investigation report, the causes of the dual-mode TBM jamming a ident in hard rock geological section and the difficulty relief measures were studied by means of auxiliary oil cylinder and fixed-point blasting. The research results show that under the action of the auxiliary thrust cylinder in the soil, the overall forward displacement of the equipment a umulates 11cm, and TBM escape fails. The fixed-point blasting method is divided into four steps, trial blasting, working tunnel excavation, overall excavation of the working face, and overall excavation above the shield. After the eighth blasting, 2~3 rings of cavities were blasted forward. The nor mal progress of TBM proves the feasibility of this scheme, and the research results may provid