- 1、本文档共105页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
CG PC Measured Demand Over Control Area - ….doc
Settlements Billing
Configuration Guide: Measured Demand Over Control Area
Pre-calculation
Version 5.11
Table of Contents
1. Purpose of Document 3
2. Introduction 3
2.1 Background 3
2.2 Description 8
3. Charge Code Requirements 9
3.1 Business Rules 9
3.2 Predecessor Charge Codes 14
3.3 Successor Charge Codes 14
3.4 Inputs – External Systems 15
3.5 Inputs – Predecessor Charge Codes or Pre-calculations 20
3.6 CAISO Formula 24
3.7 Outputs 72
4. Charge Code Effective Date 104
Purpose of Document
The purpose of this document is to capture the requirements and design specification for a SaMC Charge Code in one document.
Introduction
Background
In the allocation of various payment and charges, the amounts are divided among Business Associates (BAs) in proportion to their relative contribution to the overall Measured Demand quantity (in MWh) over which the allocation is performed. Thus, an allocation of payment or charges requires the following two Measured Demand calculations that are conducted for the particular time period over which the allocation is performed:
the overall metered CAISO Demand plus Real-Time Interchange export schedules, excluding that portion of Demand of Non-Generator Resources dispatched as Regulation through Regulation Energy Management, in the grid sector or area over which the allocated payments and charges apply and
the contribution of each Business Associate to the overall CAISO Demand plus Real-Time Interchange export schedules, excluding that portion of Demand of Non-Generator Resources dispatched as Regulation through Regulation Energy Management.
To provide the Measured Demand quantities that are used in multiple charge code calculations that allocate various payments or charges, the CAISO implements a set of Pre-calculation processes, referred to as Measured Demand Pre-calculations, to calculate particular Measured Demand quantities. There are five (5) Measured Demand Pre-calculation configurations in which an overall Measured D
您可能关注的文档
最近下载
- 2025贵州省旅游产业发展集团有限公司招聘115人备考试题及答案解析.docx VIP
- 基于PLC的自动化立体车库控制系统设计.doc VIP
- 临床实验室检测操作规范.pdf VIP
- 2025贵州省旅游产业发展集团有限公司招聘115人笔试参考题库附答案解析.docx VIP
- 新外研版7年级上册英语整册同步教学课件(2025年7月修订).pptx
- 腹膜透析常见并发症及处理.pptx VIP
- 地面站航线规划题目(整理版).pdf
- 2025贵州省旅游产业发展集团有限公司招聘115人笔试备考题库及答案解析.docx VIP
- 钢板规格型号-厚度尺寸全集.doc VIP
- 节后复产隐患整改方案和复工报告.docx VIP
文档评论(0)