- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Power supply system of high-rise building design ? Abstract: With the continuous development of city size, more and more high-rise buildings, therefore, high-rise building electrical design to the designers had to face. In this paper, an engineering example, describes the electrical design of high-rise buildings and some of the more typical issues of universal significance, combined with the actual practice of an engineering solution to the problem described. Key words: high-rise building; electrical design; distribution; load calculation 1 Project Overview The commercial complex project, with a total construction area of ??405570m2, on the ground floor area of ??272330m2, underground construction area of ??133240m2, the main height of 99m. Project components are: two office buildings, construction area is 70800m2, 28 layers, the standard story is 3.2m. 2 Load Calculation 1) Load characteristics: electric load, much larger than the national civil engineering technical measures Large 120W/m2 indicators, especially in the electricity load more food, and different types of food and beverage catering different cultural backgrounds also high. 2) the uncertainty of a large load, because the commercial real estate rents are often based on market demand, and constantly adjust the nature of the shops, making the load in the dynamic changes. 3) There is no specification and technical measures in the different types of commercial projects refer to the detailed parameters of the shops, engineering design load calculation in the lack of data, in most cases to rely on staff with previous experience in engineering design calculations. Load the selection of parameters: for the above problems, the load calculation, the first developer of sales and good communication, to determine the form of layers of the forms and nature of floor area, which is calculated on the basis of electrical load basis; followed to determine parameter index within the unit area of ??shops is also
您可能关注的文档
- 成本管理外文文献及中英文翻译.doc
- 成本管理外文文献及中英文翻译中国企业成本管理的现状分析与对策.doc
- 成本控制外文中英文翻译.doc
- 换言之中英文翻译第二章讲义西外李林波.doc
- 手机系统外文中英文翻译深入理解安卓系统的安全性.doc
- 数字图像处理外文中英文翻译外文文献英文文献数字图像处理与边缘检测.doc
- 数字信号外文中英文翻译外文文献英文文献数字信号处理器简介.doc
- 我国的冷链物流市场及其发展策略外文中英文翻译.doc
- 我国汽车工业的自主开发外文中英文翻译.doc
- 我国智能电网发展问题探讨文献中英文翻译.doc
- 电气外文中英文翻译.doc
- 电气自动化专业毕业设计外文中英文翻译(中英文对照中英文翻译)制冷压缩机速度的模糊控制.doc
- 电子商务前沿外文中英文翻译.doc
- 电子商务在发展中国家国内政策方面的问题与WTO谈判外文中英文翻译.doc
- 电子信息工程毕业设计外文中英文翻译单片机基础.doc
- 电子信息工程测控技术与仪器外文中英文翻译外文文献英文文献SJA1000独立的CAN控制器应用指南.doc
- 电子信息工程外文中英文翻译外文文献英文文献基于GPRS远程监控系统数据终端的研究.doc
- 电子信息工程专业毕业论文外文中英文翻译.doc
- 电子信息工程专业外文中英文翻译DS18B20介绍.doc
- 盈余管理是否影响公司的投资决策?外文中英文翻译.doc
文档评论(0)