土方明挖英文施工方案construction method statement.docVIP

土方明挖英文施工方案construction method statement.doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
土方明挖英文施工方案construction method statement

1. MAIN DAM FOUNDATION EXCAVATION OBJECTIVE The main objective of this method statement is to describe in detail the sequence of works and establish priorities of work to allow embankment filling to start by scheduled in the baseline programme on 17-Jan-2003. An immediate objective will be to expedite works and expose the plinth at the dam foundation for geotechnical investigation. This method statement and includes the following: Haul roads and disposal areas, Preparation of secondary river crossings, Dewatering, Preparation of loading platform, and Earth/rock excavation for integrated cofferdam foundation. ZONING OF WORK AREAS: From the drawing, ‘by drawing a line connecting the highest point of the ridges of both left and right banks, the main dam work area is divided into the following work zones: Area 1: From downstream face of auxiliary cofferdam to the dam axis of integrated cofferdam; Area 2: From the dam axis of integrated cofferdam to the main dam axis, below elevation 130m for the right bank, below elevation 140 for the left bank, and including the riverbed. Area: From the main dam axis to the down stream limit of Main Dam, below elevation 130m for the right bank, below elevation 140 for the left bank, and including the riverbed downstream of MD Axis. Area 4: From the dam axis of integrated cofferdam to downstream limit of the Main Dam, above elevation 130m for the right bank, above elevation 140 for the left bank. Each work zone is is further divided into sub-areas, each subdivision is basically defined into left abutment, riverbed and right abutment sections. Please refer to drawing no. MDEX-MS-001 (Attachment 1) METHODOLOGY Preparation of Haul Roads Disposal Areas Haul Roads The following haul roads shall be prepared for haulage of excavated material: Road R1: Main haul road Road R1-1: Connects right abutment at EL 210 to R1. Road R1-2: From loading platform at Right Abutment @EL 130, to the upstream face of auxiliary cofferdam, and connected

文档评论(0)

zijingling + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档