- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
eulogize赞美(eulog说ize说好话)
Cape and lengthways reinforcing bars pointing of intersection all should tie Prison.Cut noodles variety in the pillar, peeping out of its bottom layer pillar reinforcing bar part, have to in advance accept before the reinforcing bar of colligation beam Shrinking is accurate, the frame beam Jin should put in the pillar Zong Jin seamy side. The pillar lord Jin adoption gives or gets an electric shock residue pressure the Han together cut to deal with contact 50% that the reinforcing bar area is no bigger than total reinforcing bar area inside the noodles while welding, Its dealing with contact should shunt a 35 d above. 5.3.5Concrete engineering 1.mix the material quality of making the concrete have to strictly control, the cement should meet country mark GB175-92 requestses; Freestone class going together with should meet a request with impurities content;The in addition quality should meet a request;The fluid matter should meet a request. 2.the concrete start construction before should advance to apply for a match first to compare.Strictly press match to weigh on the scales to up anticipate than the dosage while mixing to make, Strict control water ash compare with collapse to fall a degree.Mix blend time to be no less than 120 Ss. 3.Sprinkle pillar first while sprinkling concrete, sprinkle beam plank behind.The top-grade water segment the pillar beam plank concrete can sprinkle to build in a row each time, A time of completion, in the center intermittent time not over the 2 hs, can also sprinkle to build respectively by the pillar and the beam plank, the construction of flowing water segment sews The proper detention is shearing the dint smaller part, the building covers the general detention is in the time beam across in 1| inside 3 scopes, the stairs construction sews to detain at each Up, next three place, should will float syrup before connecting to sprinkle concrete and loose move pebble clearance, hurtle to clean combine well moist, again Use to deal with con
您可能关注的文档
最近下载
- 高电压技术赵智大第三版.pptx VIP
- 长江经济带发展战略(第1课时)示范公开课教学课件【高中地理必修第二册鲁教版(新课标)】.pptx VIP
- 2024上海全民国防教育知识线上答题活动题库及答案 .pdf VIP
- 管理会计学复习笔记.pdf VIP
- 11ZJ111 变形缝建筑构造(OCR).pdf VIP
- 粮油供货合同.docx VIP
- 网络安全协议分析与案例实践.ppt
- 1.《沁园春长沙 》课件(共49张PPT) 2024-2025学年统编版高中语文必修上册.pptx VIP
- 《口腔颌面外科学》课件——第三章 局麻并发症.pptx VIP
- 2025年入党积极分子培训班结业考试试题及答案.docx VIP
文档评论(0)