- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
英文及翻译土木基础筏板及基础梁分项工程施工方案
Foundation raft the plank and the foundation beam item engineering start construction project
1, General situation and main engineering measure:
This engineering foundation design has a beam type the raft plank the foundation for reinforcing bar Mao.The raft plank flat surface presents a L form, raft plank thick 550 mms, the width 22.16 ms, thing to the length 44.36 ms, the south is northern toward the length 82.78 ms.The foundation beam cuts the noodles size as 400 ×s 600 mms.The Mao marks the number as C25, the total square measures for the 1310 ms 3, the reinforcing bar used measures 150 Ts.At 16-18 stalk closes to 18 and stays and has a 1 m the breadth of run-through after sprinkle and take, after sprinkle and take Mao and need corpus completion of work empress then sprinkle and build.
2, Start construction deployment and main construction project:
Template engineering the workload is small, start construction simple, so take no account of dividing the line a construction segment, whole is a construction segment;Reinforcing bar and Mao sprinkle to build engineering, hereafter sprinkle to take to is divided into two construction segments for boundary, organize a simple flowing water construction.The reinforcing bar engineering starts construction first 1-16 stalks(I segment), sprinkle to build Mao after check, concealed examination accepted qualified.At sprinkle to build a Mao to continue at the same time colligation 18-58 stalks(II segment) reinforcing bar, sprinkle to build a Mao in a row after check, concealed examination accepted qualified.(The I segment Mao measures about is a 660 ms 3, II segment Mao about is a 650 ms 3).Main construction method is as follows:1.Template engineering (1)Template adoption already set combination steel template, the U type wreath links.Mat level after cleaning off, first the cent segment puts together to pack, the template puts together to brush a good insulation first before packing.(The insulation mainly uses an engine oil)
您可能关注的文档
最近下载
- 电工技能鉴定实操题库(高级工).pdf
- GB/T38058-2024民用多旋翼无人机系统试验方法.pptx VIP
- 公园绿化养护管理制度 .pdf VIP
- 2025甘肃甘南州专业化管理的村党组织书记招聘45人笔试备考试题有答案详解.docx VIP
- 2023-2024学年重庆市凤鸣山中学数学七年级第一学期期末经典试题含解析.doc VIP
- 必威体育精装版公务员面试试题经典题及答案.docx VIP
- 长恨歌意象研讨分析.pdf VIP
- 2025甘肃张掖市专业化管理村党组织书记招聘32人备考试题及答案解析.docx VIP
- 江西省临川第一中学2024-2025学年高一上学期开学考试数学试题(解析版).docx VIP
- QSR质量手册(超详模板).doc VIP
文档评论(0)