- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
计算机outcome3
Unit Title: Information and Communication Technology in Business (F84W 35)Assessor Name: Lin ChangSubmission Date: 15/04/2016Project plan for Crown Catering Services’ marketing survey projectCandidate Name:XujunSCN:157039598Group Award:Global Trade and Business GG5F 16Grade Class: Grade2013, Class3Word Count: 4681.0 A discussion of your planning of Crown Catering Services project.When the project manager wants to create accurate task and phases for most complex project, the project manager should follow a combination of top-down planning. Therefore, firstly, the project manager will create a top-down project and the resources to be executed to provide the subtasks at each stage. This is achieved by assigning the project as the main tasks, and then further divided into smaller tasks with their own time, quality and cost objectives assigned to them. This is called the Work Breakdown Structure.2.0 A discussion of the design you have employed to Crown Cater Services project.Project manager should have an essential skill that defining the right tasks to create the deliverable. Therefore, the list of tasks created by the project manager in the project should describe all the jobs that are needed in order to complete the project. We should ensure that all the tasks can be achieved in time. It means that we should consider that overall project duration should correlate to task duration. We should estimate task durations. The good source of task duration estimates includes historical information from previous and similar projects and so on. Therefore, for complex projects, the project manager should combine these strategies to estimate the task duration. Inaccurate estimation of task duration is the main source of project risk, so it is well worth the effort.3.0 Gantt chart printouts with analysis and interpretation of key issues. When milestones occur, identify the critical path and any constraints.Crown Catering Services’ Survey projectCritical pathUncritical pathIDMain t
您可能关注的文档
最近下载
- 人教版二年级上册数学全册教学设计(配2025年秋新版教材).docx
- SL734-2016水利工程质量检测技术规程.docx VIP
- 有限空间专项施工方案-消防水池.doc VIP
- (正式版)DB42 1096-2015 《金属非金属矿山企业职业卫生管理技术规范》.docx VIP
- 数学教学设计表格式.pdf VIP
- 第二十二章 二次函数 单元教学设计 人教版数学九年级上册.pdf VIP
- GB 50147-2010 电气装置安装工程高压电器施工及验收规范.docx VIP
- 水利工程质量检测单位资质等级标准.pdf VIP
- 超大型FPSO船舶的电力系统设计简介.pdf VIP
- 2025四川成都市青羊区人民政府金沙街道办事处招聘编外人员3人笔试备考题库及答案解析.docx VIP
文档评论(0)