水轮机磨蚀问题(Abrasion problem of hydraulic turbine).docVIP

水轮机磨蚀问题(Abrasion problem of hydraulic turbine).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
水轮机磨蚀问题(Abrasion problem of hydraulic turbine)

水轮机磨蚀问题(Abrasion problem of hydraulic turbine) There are two basic types of small hydropower stations in Hebei Province: power station power station and canal on a building to the original water conservancy projects supporting the dam; the second is the river diversion type power station. The first kind of power station has good water quality and clear water flow. The second types of diversion hydropower stations have the problems of poor water quality, large amounts of debris and large sediment content. In recent years, with the deterioration of the ecological environment, the aggravation of soil erosion and the insufficient consideration of sediment erosion in the early stage of construction, the problem of sediment erosion of water diversion turbines has become more and more serious. This serious problem is in front of us. 1 abrasion status of diversion hydropower station in Hebei Province 1.1 diversion type power station distribution Hebei province water conservancy system for single 500kW and more than 51 power stations, hydroelectric generating units total units 130 units, installed 161.862MW, 20.844GWh power generation in 2000, of which the river diversion type power station 26, accounting for 50.9% of the total number, hydroelectric generating units 70 units, accounting for 53.8%, the total installed capacity of 60.202MW, accounting for 37%, electricity production in 2000 accounted for 114.80GWh 55%. Located in Zhanghe, Tanghe, Shahe, Hutuohe, Juma River, Chaobai River, Luanhe River and major tributaries. These plants are located in Hebei province river sediment carried serious rivers, such as Zhanghe long-term average sediment transport capacity of 25 million 800 thousand tons, Tanghe average annual sediment load of 1 million 800 thousand tons, the river hydropower station without exception, there are problems of abrasion of turbine. With the acceleration of the construction of small hydropower stations, the proportion of diversion hydropower stations in 50

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档