Building professional internship network report(建立专业实习网络报告).doc

Building professional internship network report(建立专业实习网络报告).doc

  1. 1、本文档共16页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Building professional internship network report(建立专业实习网络报告)

Building professional internship network report Write papers network: According to the school arranged for me on June 10, 2005 5 construction company in Hebei Ministry project construction practice, building a professional internship report I know this is a good opportunity for the construction site, let me deeper understanding of theory and practice the difference. 1: Project Overview The project is state-owned investment company in Hebei Province’s apartment building professional development internship report, the construction unit is the fifth construction company, Hebei, were fifth and sixth building, and golf fitness floor, from the fourth pile foundation companies. by the Beijing Design Institute. using frame-shear wall structure, columns of the opposite sex column. an area of ??13,000 square meters, consists of three buildings consisting of commercial and residential, in-situ reinforced concrete six-story frame-wall structure. II: Internship 1: 1 template wood types and production methods, 2 various structural template installation quality standards, 3-situ structure template quality installation standards, 4-situ removal of the template structure and sequence of time, remove the template Notes 5, 6 template cleaning, stacking and maintenance methods and requirements. 2: Gang Jingong a steel type and shape characteristics, 2 steel welding methods and quality requirements, the report of the construction of reinforced cold professional practice methods and techniques, 4) steel banding methods and quality requirements, the lap steel banding 5 length requirements, 6 the thickness of the protective layer of various components of control, 7 hidden engineering master recording method and the main content. 3: The concrete work a mixer type, size, mixing principle, two types of vibration control, the scope of construction with more than 3 signs of conversion and the content of 4 construction joints leaving in their treatment, 5 mixed soil conservation

您可能关注的文档

文档评论(0)

jiupshaieuk12 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6212135231000003

1亿VIP精品文档

相关文档