Building Majors internship report in December 2012(2012年12月建立专业实习报告).doc

Building Majors internship report in December 2012(2012年12月建立专业实习报告).doc

  1. 1、本文档共6页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Building Majors internship report in December 2012(2012年12月建立专业实习报告)

Building Majors internship report in December 2012 Summer vacation early to drop the curtain a week distant summer vacation with my family and friends not only cheerful, more missing in the past summer not too internship experience. Originally, this report should be immediately after the end of the internship write on, but the end of a busy internship life people can not wait to enjoy summer tail, will this thing back. Secondly, write a report always want to keep the memories thinking conceived so self-summary stage always have. reporting such articles, I have not wrote, but have seen some similar report is nothing more than introduce some of the pros and cons of their own work and internship , of course, this cons include mentally with the two aspects of knowledge on this summary is perfect, never omitted but this summary is not simply separated from the always complementary can not be separated Here, I took two days of the internship to make a summary report. Internship is about to start on July 26, the start is a bunch of trouble, I’d like breakfast into the internship, but always twists and turns to find the director of this project, probably led by reason, the total in her hands but can not for my busy. finally inform the afternoon of the third day of my internship I finally work. internship in our county inside the Urban Construction Bureau, Urban Construction Bureau, role in the project construction is quality control and supervision of quality control in the laboratory, after the construction site, not exposed to the forefront of the project, so I go with the flow of placed in the Supervision Department, but this role is also our future employment a direction. Supervision Department and the construction team project department is an office. Supervision Department a total of plus four of my supervision. supervision Chen, aged 17 or 18 like a medium height, always cheerfully daily look, then I realized he before construction supervision certificate later

您可能关注的文档

文档评论(0)

jiupshaieuk12 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6212135231000003

1亿VIP精品文档

相关文档