Specification for Internal Gear Pumps Viking (规范内部齿轮泵的海盗).pdfVIP

Specification for Internal Gear Pumps Viking (规范内部齿轮泵的海盗).pdf

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Specification for Internal Gear Pumps Viking (规范内部齿轮泵的海盗)

Specification for Internal Gear Pumps 1.0 GENERAL DESCRIPTION 1.01 Scope Pump type shall be of heavy-duty internal gear type. One rotor of internally cut gear teeth will mesh with one externally cut gear. Fluid shall be carried between gear teeth and shall be displaced when the gear teeth mesh. The surfaces of the rotors and housing shall cooperate to provide continuous sealing. Internally cut rotor shall terminate at the end of the drive shaft. The drive shaft shall be supported by bearings at two (2) locations, where by both radial and axial support is provided. 1.02 Pump Manufacturer Acceptable manufacturers are Viking Pump or substitute approved by the Engineer prior to bid (See paragraph 1.03, Pre-submittal). A manufacturer’s being named in this specification notwithstanding; all equipment approved for this project shall meet or exceed all performance, service, and warranty requirements of this specification. 1.03 Pre-Submittal Technical documentation which shows total compliance with all performance, construction, service, and warranty requirements of this specification shall be submitted by the pump manufacturer or its authorized representative2 at least days prior to bid . Equipment must be conditionally approved by the Engineer in 1 writing at least days prior to bid for all named or substitute manufacturers in order to be offered for this project . days prior to bid, the Engineer shall 1 furnish a final listing of equipment appearing to meet this specification and conditionally approved for this project

文档评论(0)

jiupshaieuk12 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6212135231000003

1亿VIP精品文档

相关文档