- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
土方量的计算(Calculation of earthwork)
土方量的计算(Calculation of earthwork) Earthwork calculation 8.2.1 DTM method of earthwork calculation By the DTM model to calculate the earthwork volume is measured according to the coordinates of ground points (X, Y, Z) and the design elevation, by generating triangulation to calculate the amount of earthwork every three pyramid, finally accumulated earthwork specified within the scope of cut and fill, and draw the demarcation line of earthwork. Three methods DTM method is a kind of earthwork calculation, is calculated by the coordinate data file, one is calculated in accordance with the elevation point on the map, the third is calculated in accordance with the triangulation on the map. The process of re establishing the triangulation algorithm contains two, third methods of directly using the existing map triangle, triangle mesh reconstruction no longer. The operation process of the following three methods: 1. according to the coordinate calculation L draw the line to calculate earthwork composite area must be closed, but dont try to fit. Because the line iterative fitting curve in earthwork calculation, influence the accuracy of calculation result. L with a click of the mouse from engineering application of \DTM method in earthwork calculation according to the coordinate file \. L tip: choose a click of the mouse from the painting line closed line figure 8-3 pop-up composite Earthwork Calculation Parameters dialog box. Figure 8-3 earthwork calculation parameters Area: the value of composite wire enclosed polygon level projection area. Flat field elevation: refers to the target to achieve the design elevation. Boundary sampling interval: boundary interpolation interval set, the default value is 20 meters. The slope slope treatment setting: select check box, then set the slope function is optional, selected slope way (up or down: a flat field elevation relative to the actual ground elevation height, flat field elevation above the ground elevation is downward sloping). T
您可能关注的文档
- 魔术隐形线生产.doc
- 魔术PPT(10P).ppt
- 魔术泡泡表演 - 适合互动节目.ppt
- 魔术贴生产过程.doc
- 魔法社会精神魔法教学计划书.doc
- 魔法魔术课件.ppt
- 魔法魔法.ppt
- 魔法魔杖.doc
- 魔盒解决方案.pdf
- 鲁祥岭环保先进的个人素材.doc
- 土概考点(Local survey site).doc
- 土石方工程施工方案(Construction scheme of earth and rock works).doc
- 土石方工程施工机械的合理选配(Rational selection of construction machinery for earth and stone works).doc
- 土石方技术交底(Technical disclosure of earthwork).doc
- 土石方常用计算方法(Commonly used methods of earthwork calculation).doc
- 坦克世界战斗力计算方法(Calculation method of tank world combat effectiveness).doc
- 塑化剂的危害....(The harm of plasticizing agent).doc
- 塑料、树脂的英文缩写(Plastic, resin).doc
- 塑料材料缩写(Plastic material abbreviation).doc
- 土地资源管理资料(Land resources management information).doc
文档评论(0)