新建路基开挖的控制方法和注意事项(The new control method of subgrade excavation and precautions).docVIP

新建路基开挖的控制方法和注意事项(The new control method of subgrade excavation and precautions).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
新建路基开挖的控制方法和注意事项(The new control method of subgrade excavation and precautions)

新建路基开挖的控制方法和注意事项(The new control method of subgrade excavation and precautions) The new control method of subgrade excavation and precautions of.Txt life, face the fate of destruction. I do not love eolian dust, it seems to be mistaken by the front edge!! I only shed tears for the one I love most. I will learn to give up on you, because I love you too much. I won. I could give up the whole world construction preparation and construction methods (1) preparation for construction The transfer line piles, check the traverse point, route through survey, survey content including wire, middle and elevation, additional level of review points, the cross section of the measuring and drawing, and then sent to the verification engineer, after checked by on-site surveying, put out medium left pile, pile, and mark cut and fill subgrade height, location and dump etc., and submit the approved inspection engineer. (two) construction methods and measures 1. Earthwork excavation The soil cutting or stone cutting soil and weathered layer, to expand the working face, using the mixed excavation construction method using 1 ~ 2m3 backhoe with 8t ~ 15t or 165KW 3m3 dump trucks bulldozers, loaders and 8-15T dump truck earthwork excavation, excavation from top to bottom, with tight protection after excavation. According to certain parts of the contract section of deep section more characteristics of the slope high, the construction method of excavation with protection of slope excavation, excavation of Taiwan, Taiwan protection, slope instability to take construction method of piecewise interval. Construction notice: (1) before the excavation of the subgrade, a good cutoff ditch shall be constructed first; (2) when excavation is made in an aquifer, the water shall be drained and stopped before excavation; (3) section of the earthwork excavated roadbed construction elevation, to consider subsidence due to compaction, its value is determined by the test; do geotechnical test of subgrade design

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档