- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
土建房屋工程施工放线方法(On line method of civil building engineering construction)
土建房屋工程施工放线方法(On line method of civil building engineering construction) Zero Civil / housing project construction line is started from the positioning of the building, until the main project can not be separated from the construction line. It can be divided into three stages: building location (laying out), foundation construction (caving) and main construction (caving). A, building location, is the first line of the housing construction project after the start of the building, personnel positioning is: in the city planning department (survey team affiliated) measurement personnel and construction units (Professional), positioning according to the construction planning of location map, finally formed at the construction site (at least) 4 positioning pile. The wiring tool is total station instrument or advanced theodolite. Two, basic construction line, building location pile set, by professional surveyors, the construction unit of the construction site and the person in charge of the project on the basis of mutual supervision and measurement on line review (supervision personnel is mainly on-site supervision and verification), positioning the last released all the buildings pile axis (according to the building size or axis on line), all interval axis positioning pile is according to the positioning planning departments of the pile (at least 4) and the bottom of the building construction plan to put the line. The wiring tool is theodolite. After the completion of the foundation positioning, the surveyor and the builder at the construction site will release the foundation line according to the axis of the location, so as to carry out the foundation excavation. Line tools: theodolite, Longmen plate, rope, wire pendant, steel tape etc.. Small works may have no surveyor, or a builder. Note: the base axis shall be located in the permanent building or fixture around the proposed building while the foundation line is laid out to prevent damage to the axle locating pile and b
您可能关注的文档
- 不朽神迹攻略(Immortal miracle).doc
- 不确定度概述(Overview of uncertainty).doc
- 不等式证明2(Inequality proof 2).doc
- 不能不懂装懂的句子(Cannot smatter sentence).doc
- 不要让未来的你讨厌现在的你(Don't let the future fool you).doc
- 不要这样思考问题(Don't think about it this way).doc
- 不规则动词变化(Irregular verbs change).doc
- 不规则动词笔记(Irregular verb notes).doc
- 东北农业大学 蓄产品加工 乳笔记(Northeast Agricultural University dairy diary).doc
- 东北话考试(Northeast dialect examination).doc
- 土建资料员流程(Civil engineering data flow).doc
- 土方开挖技术交底(Earthwork excavation technology).doc
- 图像处理扫盲必看(Image processing literacy must see).doc
- 围绕中心工作处理好服务与监督的关系(Work closely with the center to handle the relationship between service and supervision).doc
- 围巾的一些种类和搭配技巧(Some kinds and collocation skills of scarves).doc
- 土木工程专业生产实习(Production practice of Civil Engineering Specialty).doc
- 土木工程化学基础(Fundamentals of Civil Engineering Chemistry).doc
- 土方开挖施工方案(Earthwork excavation construction plan).doc
- 土木工程概论学习心得(Introduction to civil engineering studies).doc
- 圣元战略部署(Shengyuan strategic deployment).doc
文档评论(0)