- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
土方开挖技术交底(Earthwork excavation technology)
土方开挖技术交底(Earthwork excavation technology) Technical disclosure records Specific date Project name Zheng Dong new tube City Village resettlement district two three building engineering group 6# Ground and foundation engineering Project Name: Earthwork excavation Work content A, construction preparation: 1, the main equipment: sharp, flat shovel, hammer, trolleys, ladders, picks, crowbar, ruler, slope ruler, small line No. 20 wire etc.. 2, the operating conditions: (1) before excavation, (2) we should find out the underground pipelines and other obstacles, (3) and should be based on the requirements of the construction program, (4) will be within the construction area of the ground, underground obstructions removed and disposed of. (5) the position or location of buildings or structures of the control line (pile), (6) (7) standard size quasi level pile and foundation gray line, (8) must be tested qualified and finished pre screening procedures (9). (10) surface clean up (11), good drainage slope, (12) in the construction area (13) to dig the temporary drainage ditch. (14) night construction, (15) the process should be reasonable arrangements (16) to prevent wrong dig or overbreak. The construction site should be based on the need to install the lighting facilities (17) should be set clearly marked on the dangerous section (18) records. (19) the excavation is below the ground level (tank) trench, (20) on the basis of local engineering geological data, (21) to take measures to reduce the groundwater level, (22) to fall below the bottom surface of the 50cm excavation, and then excavation (23). Familiar with the drawings (24), (25) technical work. Two, operation process: 1, process: To determine the order and slope excavation cutting groove edge contour along the gray line stratified excavation Trim slot bottom cleaning Sure, the slope of the 2: (1) the natural moisture in soil, excavation of the foundation pit (groove) and trench excavation, when the specified depth does
您可能关注的文档
- 不确定度概述(Overview of uncertainty).doc
- 不等式证明2(Inequality proof 2).doc
- 不能不懂装懂的句子(Cannot smatter sentence).doc
- 不要让未来的你讨厌现在的你(Don't let the future fool you).doc
- 不要这样思考问题(Don't think about it this way).doc
- 不规则动词变化(Irregular verbs change).doc
- 不规则动词笔记(Irregular verb notes).doc
- 东北农业大学 蓄产品加工 乳笔记(Northeast Agricultural University dairy diary).doc
- 东北话考试(Northeast dialect examination).doc
- 不规则动词表11(Irregular verbs table 11).doc
文档评论(0)