四川省水利水电建筑工程预算定额的土方工程说明(Earthwork engineering specification of budget quota for water conservancy and hydropower construction project in Sichuan).docVIP

四川省水利水电建筑工程预算定额的土方工程说明(Earthwork engineering specification of budget quota for water conservancy and hydropower construction project in Sichuan).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
四川省水利水电建筑工程预算定额的土方工程说明(Earthwork engineering specification of budget quota for water conservancy and hydropower construction project in Sichuan)

四川省水利水电建筑工程预算定额的土方工程说明(Earthwork engineering specification of budget quota for water conservancy and hydropower construction project in Sichuan) Chapter 1 earthwork budget of water conservancy and hydropower construction project in Sichuan Province Explain First, this chapter includes earthwork excavation, transportation, compaction and other fixed total of 50 sections, applicable to water conservancy, electricity, construction works earthwork. Two. The unit of measurement for earthwork quotas shall be calculated in accordance with the natural law except as noted. Three. The name of earthwork quota Natural Square: refers to the natural state of the earth without disturbance. Pine: refers to the natural side by manual or mechanical excavation and loose soil. Solid side: refers to the filling (backfill) and after the compaction of finished products. Four, soil class division, in addition to frozen soil, according to the earth rock sixteen classification method of the first four grades, soil class level. Five, earthwork excavation and filling engineering, in addition to work quota provisions, including digging ditches and small slope repair, remove the ground turf debris, traffic control, safety facilities and road construction and maintenance work area and dumping field. Six, the general earthwork excavation quota applies to the general open excavation earthwork and the opening width of more than 16m of the channel and the mouth area is greater than 80m2 column pit earthwork. Seven, the quota of earthwork excavation of the canal is suitable for the earthwork of the trapezoidal section, the long strip shape and the bottom edge which need to be trimmed and the channel width is less than or equal to 16m. Eight, trench excavation quota, suitable for wide is less than or equal to 4m or slope steeper than rectangular section 1: 0.5 trapezoidal, rectangular length greater than 3 times the width of the bottom slope, only repair does not repair the earthworks, such as wall, wa

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档