通信专业实务1(Communication practice 1).docVIP

通信专业实务1(Communication practice 1).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
通信专业实务1(Communication practice 1)

通信专业实务1(Communication practice 1) Professional practice 1.txt yesterday was an invalid check; tomorrow is an outstanding promissory note; cash is the only cash that can be cashed at any time. People always love to deceive ourselves, because it more easily than to deceive others. This article is contributed by raynumdo DOC documents may experience poor browsing on the WAP side. It is recommended that you first select TXT, or download the source file to the local view. Communications professional practice A RadioButtonList, 1, the structure of Chinas long-distance network at this stage (two two) two 2 level structure, frame relay (using statistical multiplexing, applicable to all kinds of unexpected data service users. Statistical multiplexing) multiplexing 1 Internet IP layer belonging to the architecture of TCP/IP (3) network layer network, mobile IP technology refers to processing (cellular mobile cellular mobile cellular mobile telephone call) principle 4, signaling transmission between users online user terminal to exchange all can be classified into (subscriber line signaling (subscriber line signaling) the basic functional structure of 5,7 signaling system by MTP and (UP UP UP 6,7) is composed of two signaling system in SCCP (signaling connection control signalling connection control part) signaling connection control part 7, from the timing device clock node in use (PLL PLL) the The clock frequency node locked in frequency reference clock source. PLL 8, GPS is the U.S. Naval Observatory set up a set of high precision satellite global positioning system, it provides the signal to the time (UTC UTC) tracking UTC 9, the composition of TMN can be divided into (three level three level three level 10), base station subsystem (BSS BSS) can be divided into (BSC) and BTS two functional entities. BSS (11 TD-SCDMA, a carrier bandwidth for (1.6MHz) 1.6MHz) 1.6MHz). 12, using the intelligent network (No.7 signaling No.7 signaling exchange between the layer and the business

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档