- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
深圳维修监控(Shenzhen maintenance control)
深圳维修监控(Shenzhen maintenance control) Shenzhen Futian Free Trade Zone, Sha Wei Shi Xia Xinzhou Cun \ \ \ \ Che Kung Temple \ Xiasha Zhuzilin maintenance monitoring Fault monitoring documents provided by the Shenzhen Shenzhen UTS computer installation and maintenance for computer monitoring UTS In a monitoring system is completed to enter the commissioning phase, commissioning phase before delivery, there may be a variety of faults, such as the common: not the normal operation of system is not up to the technical index, the design requirements of the overall performance and quality is not ideal, especially for a complex, large-scale monitoring the project is, it is can hardly be avoided, we need to make corresponding treatment to solve the problem, ensure the normal operation of the system. 1 monitor the power failure caused by incorrect equipment. The incorrect power generally has the following several possibilities: power lines or power supply voltage is not correct, the power is not enough (or a road supply line size is not enough, the big buck), transmission line power supply system of the short circuit, open circuit, instantaneous overvoltage etc.. In particular, equipment failures due to power supply errors or transient overvoltage have occurred. Therefore, in the system debugging, before power supply, we must seriously and strictly check and check, should not be taken lightly. 2. because some monitoring equipment has many links, if not handled well, especially with the equipment connecting lines are not handled properly, there will be open circuit, short circuit, wire insulation, as a result of adverse false wiring damage, the problem of declining performance equipment. In this case, according to the phenomenon of failure calmly analysis, to judge in a number of lines is due to what the connection of the line has problems, then produce that kind of fault. Therefore, special attention should be paid to the connection between the equipment and the various lines o
您可能关注的文档
- 施工放线(工地实用)(Construction release (site utility)).doc
- 施工的工艺流程(Construction process).doc
- 旅游知识问答(Travel quiz).doc
- 施工放线之内控法怎样操作施工放线之内控法怎样操作(How to operate the internal control method of construction line and how to operate the internal control method).doc
- 旅游网络公共关系营销探索(Exploration of public relations marketing in Tourism Network).doc
- 旅游规划应着力的八个要点(Eight points to be stressed in tourism planning).doc
- 施工残忆(Construction remnant).doc
- 无心磨床加工的磨削缺分析(Analysis of grinding loss in centerless grinding machine).doc
- 无损检测标准一览表(List of standards for nondestructive testing).doc
- 无比打字口诀(Very typing formulas).doc
有哪些信誉好的足球投注网站
文档评论(0)