- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
水电施工规范(Code for hydropower construction)
水电施工规范(Code for hydropower construction) Code for hydropower construction: * basic requirements Must be held by the national administrative departments of electrical certificates issued to the job, and must be in strict accordance with the relevant state electrical standards and hydropower process specifications operation. We must take the initiative to solicit opinions of the owners, patiently listen to the request of the owner, to determine a good power switch. The cold and hot water tap and water level instruments. The position, to the satisfaction of the client, we can start the construction, to avoid not fully communicate rework. The transformation of the sea in the circuit. The master and auxiliary materials all adopt national certified products. When the strong and weak circuit and the waterway are laid into the wall, each other should maintain more than 500MM distance, in the construction, the thrum should be exposed. After the completion of the hydropower renovation, the construction personnel shall draw the completed drawings of the hydropower transformation according to the actual location and submit them to the company for archival filing. * electrical construction specifications: Temporary power supply shall be provided with complete plug at the construction site. Switch. Socket. Leakage protector shall be installed. Temporary power shall be cable. The power line is divided into three colors: FireWire, red, zero blue, ground yellow. All one-way outlets should be left, zero, right, fire, middle or lit, zero connection. The power supply circuit of each room, the kitchen, the bathroom and the power supply circuit of the bathroom shall be independently used. The leakage protector must be connected with other power supply circuits and shall not overlap its other lines with its zero line. Air conditioning and other high-power appliances must be provided with dedicated power supply circuit, the air conditioner adopts 4MM power line, and the lighting line adopt
您可能关注的文档
- 施工放线(工地实用)(Construction release (site utility)).doc
- 施工的工艺流程(Construction process).doc
- 旅游知识问答(Travel quiz).doc
- 施工放线之内控法怎样操作施工放线之内控法怎样操作(How to operate the internal control method of construction line and how to operate the internal control method).doc
- 旅游网络公共关系营销探索(Exploration of public relations marketing in Tourism Network).doc
- 旅游规划应着力的八个要点(Eight points to be stressed in tourism planning).doc
- 施工残忆(Construction remnant).doc
- 无心磨床加工的磨削缺分析(Analysis of grinding loss in centerless grinding machine).doc
- 无损检测标准一览表(List of standards for nondestructive testing).doc
- 无比打字口诀(Very typing formulas).doc
最近下载
- 信号与系统——习题参考答案.pdf VIP
- 事业单位人事管理工作.pdf VIP
- 女干部心理健康知识课件.pptx VIP
- 初中英语语法思维导图(可打印).docx
- 外研版英语(三起点)六年级上册 Module3 大单元学历案教案 教学设计附作业设计(基于新课标教学评一体化).docx VIP
- 美丽汉字上海市小学生二届到十届2023年中文自修杯汉字小达人试卷(含参考答案).pdf
- 甘12G4-管沟和盖板.docx VIP
- 2.公路造价参考指标 交通运输部路网监测与应急处置中心.pdf VIP
- Unit7 Art Lesson2 Beijing Opera 课件-高中英语北师大版(2019)必修第三册.pptx VIP
- 母婴助产考试试题及答案.doc VIP
有哪些信誉好的足球投注网站
文档评论(0)