- 1、本文档共31页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Impact of quality and quantity of fuel on (燃料的数量和质量的影响)
Impact of quality and quantity of fuel
on achieving PAT targets
“Implementation of PAT Scheme in Thermal Power Stations
– Issues and Challenges”
30.1.2015 India Habitat Centre, Lodhi Road, New Delhi
Dr. W.A.Benesch
Director Energy Technolgies
PAT and power industry
• India’s PAT (Perform, Achieve, Trade) scheme provides a model to
increase economic benefits with climate co-benefits
• The PAT scheme targets energy consumption reductions of 6.6 Mio t
of oil equivalent in 478 covered facilities
• Plant specific targets are set instead of a sectorial target
• The average reduction target is 4.8%
• Power sector plays a dominant role
Dr. Benesch 30.1.2015
WE are STEAG. Our facts and figures
• WE are specialists in the generation of electricity and heat on the
basis of a wide variety of technologies, and for the marketing of
electricity and heat;
• with 9 hard coal fired and 2 refinery power plants in Germany,
and 3 hard coal fired power plants in Colombia, Turkey and the
Philippines;
• with more than 200 distributed generating facilities on
the basis of renewable sources, for energy supply to
industry and heat supply;
•
and 1,700 MW abroad;
• with a workforce of 3,700 in Germany and 2,300 abroad;
• with total sales of EUR 2.9 billion and EBITDA of EUR 366 million
in 2013;
• with an investment volume of around EUR 363 million in 2013.
Dr.Benesch 30.1.2015
We do not have a PAT scheme in
Germany but….
….. according to the rules of our electricity market we have to follow
the merit order.
This means
Highest efficiency and
Lowest fuel price
And here we are connected to PAT
Dr.Benesch 30.1.2015
Steag optimization experience with own power
stations for more than 75 years
Bergkamen A 780 MW Bexbach 1
您可能关注的文档
- Hybrid Circuits Simplify IGBT Module Gate Drive (混合电路简化门驱动IGBT模块).pdf
- Hybrid Electric Vehicle with Flywheel Energy (混合动力电动汽车与飞轮能量).pdf
- Hybrid Materials Filled by NanoSiO Doped (混合材料由NanoSiO掺杂).pdf
- Hybrid quantum computation in quantum optics(混合量子光学量子计算).pdf
- Hybrid programming MPI+OpenMP(混合编程MPI + OpenMP).pdf
- Hydraulic and Pneumatic Actuators and their (液压和气动执行机构及其).pdf
- Hydraulic Brake Calipers Optimization Modeling (液压制动卡钳优化建模).pdf
- Hyco Single Acting Telescopic Cylinders (Hyco单作用气缸伸缩).pdf
- HYDRAULIC FLUID INFORMATION - Hyvair Corp.(液压流体信息Hyvair集团。).pdf
- Hydraulic losses in pipes Politechnika (在管道 Politechnika水力损失).pdf
- 专题06 经济体制(我国的社会主义市场经济体制)-五年(2020-2024)高考政治真题分类汇编(解析版).docx
- 专题11 世界多极化与经济全球化-5年(2020-2024)高考1年模拟政治真题分类汇编(解析版).docx
- 专题03 经济发展与社会进步-5年(2020-2024)高考1年模拟政治真题分类汇编(浙江专用)(解析版).docx
- 专题09 文化传承与文化创新-5年(2020-2024)高考1年模拟政治真题分类汇编(北京专用)(原卷版).docx
- 5年(2020-2024)高考政治真题分类汇编专题08 社会进步(我国的个人收入分配与社会保障)(原卷版).docx
- 专题07 探索世界与把握规律-5年(2020-2024)高考1年模拟政治真题分类汇编(解析版).docx
- 5年(2020-2024)高考政治真题分类汇编专题06 经济体制(我国的社会主义市场经济体制)(原卷版).docx
- 专题11 全面依法治国(治国理政的基本方式、法治中国建设、全面推进依法治国的基本要求)-五年(2020-2024)高考政治真题分类汇编(解析版).docx
- 专题17 区域联系与区域协调发展-【好题汇编】十年(2015-2024)高考地理真题分类汇编(解析版).docx
- 专题01 中国特色社会主义-5年(2020-2024)高考1年模拟政治真题分类汇编(原卷版).docx
文档评论(0)