商场空调(Mall air conditioner).docVIP

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
商场空调(Mall air conditioner) Mall air conditioner 2006-3-13 Construction unit: Xiong Gu group (Shenzhen) Co., Ltd. Location: Shenzhen Caiwuwei Design time: 1993.9 United States Architectural Design Co., Ltd. Hongkong branch consultants engineering company The second Design Institute of Shenzhen Architectural Design Institute Construction time: 1994.10-1996.6 Gross floor area: the gross floor area is about 278610M2 Height: basement two, office tower sixty-nine, high 383.95m; apartment tower thirty-three, high 120.50m. Office building standard height 3.75m, apartment standard height 3.0m. Function overview: the basement two floors, respectively, car pool, pool, water pump room, power distribution room; apartment building part to five layers for the podium, respectively with shopping malls, restaurants, banks, six to thirty-three layers of suite style apartments; office buildings and apartment buildings to a high degree of the corresponding part of the five podium as the overhead layer is arranged in the middle of the two Ge layer, the first layer (overhead layer on the first layer) to sixty-nine layers for large bay buildings. Ventilation design overview Note: three air supply systems are installed on each floor of the underground car park, located in the middle of the garage. All imports of fans. In addition, due to the design of only air injection, no models and other parameters, it can not find the power term. Smoke control design Note: 1. Underground parking garage: The automatic fire equipment; Divided into the fire area of not more than 2000m2; Divided into the smoke prevention area of no more than 500 m2, each smoke prevention area has 800mm high smoke screen and independent smoke exhaust system. 2. corridor smoke evacuation: Each corridor is divided into two smoke prevention zones, each area is provided with a smoke exhaust shaft, and an electric smoke exhaust port 600*1200 is arranged, located in the middle part of the inner corridor. Each vertical shaft of smo

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档