变配电设备安装措施(Installation measures of power distribution equipment).docVIP

变配电设备安装措施(Installation measures of power distribution equipment).doc

  1. 1、本文档共15页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
变配电设备安装措施(Installation measures of power distribution equipment)

变配电设备安装措施(Installation measures of power distribution equipment) 3, distribution equipment installation measures (1) main technical parameters of main transformer: Transformer model SCB10-1600/10/6KV Transformer capacity 1600KVA Transformer ratio 10 + 5%/0.4Kv (2) the main transformer shall be in place at once. The main transformer shall be in and out of the 25t large automobile crane so as to make use of the automobile crane to carry out the main change and check the equipment. (3) the main transformer accessories shall be installed after the main transformer is checked and all the accessories shall be cleaned. (4) the installation of transformer SCB10-1600/10/6KV, the implementation of the transformer inspection, installation and testing of technical requirements, as well as the requirements of construction works. (5) the main transformer room shall be equipped with enough hoisting space during the civil construction so that the main transformer can be safely located and checked. (6) the surface quality of the porcelain parts of the transformer shall be in line with the current national standards for the technical conditions of insulators for high-voltage insulators. (7) the quality standard and the process of transformer installation, implementation of electric power equipment installation engineering of power transformer, oil immersed transformer, reactor construction and acceptance norms (GBJ14890). (8) the foundation of the high voltage cabinet shall be reliably grounded, and the bolt shall be reliably connected between the cabinet and the base and between the cabinet and the cabinet, and the levelness and verticality shall be within the prescribed scope. (9) bus installation should be straight, the joints should be flat and firm, contact shall meet the requirements for the clearance and check with the feeler. (10) the phase of the bus should be consistent with the phase between the cabinets. (11) contact resistance, circuit breaker trip, three phase, the boun

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档